Printer Friendly
The Free Library
14,588,739 articles and books
Member login
User name  
Password 
 
Join us Forgot password?

CiDRA Wins Major Mining Contract in Chile; CiDRA and Bechtel to Supply SONARtrac(TM) Process Monitoring Systems to Minera Los Pelambres.


WALLINGFORD, Conn. -- CiDRA Corporation ("CiDRA") CiDRA Corporation announced today that they have been awarded, through Bechtel Chile Ltda, a major contract to supply SONARtrac(TM) process monitoring systems to Minera Los Pelambres in Chile, the world's fifth largest copper mine. The SONARtrac systems will provide volumetric volumetric /vol·u·met·ric/ (vol?u-met´rik) pertaining to or accompanied by measurement in volumes.

vol·u·met·ric
adj.
Of or relating to measurement by volume.
 flow measurements on critical slurry slurry,
n a thin mixture of insoluble material floating in liquid.


slurry

solids in suspension. Used as a method of feeding pigs—slurry is pumped through fixed lines and delivered to troughs by hoses equipped with gasoline pump fittings.
 lines within the concentrator plant, and work integrally within the Los Pelambres expansion project awarded to Bechtel. Specifically, this win for CiDRA is part of the "Repowering Project - Minera Los Pelambres". This plant expansion will increase production of copper by 13% by increasing the ore processing capacity of the concentrator plant from 120,000 to 144,000 tons per day. It involves increasing the power of the semiautogenous (SAG) mills from 17,000 to 20,000 HP, and the ball mills from 9,500 to 10,500 HP. An additional ball mill of 10,500 HP is also being added. The Engineering, Procurement, and Construction Management (EPCM EPCM Engineering, Procurement, Construction Management
EPCM Essential Procedures for Clinical Microbiology
EPCM Enhanced Planning Control Message
EPCM Enterprise Portal Content Management
EPCM European Project & Change Management (The Netherlands) 
) is being performed by Bechtel Chile Ltda, the same company that designed and constructed the original plant. The plant expansion is a $200M project. Simultaneously a $500M project is underway to construct a new tailings Tailings (also known as tailings pile, tails, leach residue, or slickens[1]) are the materials left over[2] after the process of separating the valuable fraction from the worthless fraction of an ore.  depository The place where a deposit is placed and kept, e.g., a bank, savings and loan institution, credit union, or trust company. A place where something is deposited or stored as for safekeeping or convenience, e.g., a safety deposit box. .

Minera Los Pelambres is considered a star in the Chilean mining industry, having one of the lowest production costs in the industry. This expansion follows earlier expansions that have taken place based on significantly increased estimates in the reserves, which currently are estimated at 2.1 billion tones, which at the current pace signify around 50 years of projected life of the mine.

CiDRA's SONARtrac flow technology is a new class of industrial flowmeter See flow meter. , utilizing measurement principles that are distinct from all other flowmeter technologies operating in the mining industry.

SONARtrac non-intrusive flow monitoring systems make no contact with the slurry and can be removed and reinstalled when it is necessary to replace the pipe. As well, SONARtrac systems demonstrate a very stable output in the presence of a variety of ores, and demonstrate superior levels of performance. This passive, sonar-based technology enables measurements of single phase and multiphase Mul´ti`phase

a. 1. (Elec.) Having many phases;

Adj. 1. multiphase - of an electrical system that uses or generates two or more alternating voltages of the same frequency but differing in phase angle
 fluids, as well as slurries, with the same level of accuracy and performance.

Additional information about CiDRA can be found at www.cidra.com

SONARtrac is a trademark of CiDRA Corporation.
COPYRIGHT 2006 Business Wire
No portion of this article can be reproduced without the express written permission from the copyright holder.
Copyright 2006, Gale Group. All rights reserved. Gale Group is a Thomson Corporation Company.

 Reader Opinion

Title:

Comment:



 

Article Details
Printer friendly Cite/link Email Feedback
Comment:CiDRA Wins Major Mining Contract in Chile; CiDRA and Bechtel to Supply SONARtrac(TM) Process Monitoring Systems to Minera Los Pelambres.
Publication:Business Wire
Geographic Code:1USA
Date:Apr 4, 2006
Words:374
Previous Article:The US Jewelry Retail Industry Generates Annual Revenues of about $44 Billion from 28,000 Specialty, Department, and Discount Stores.
Next Article:Genesys Human Capital Management Trends Survey Reveals What Will Shape Strategies for 2006; Companies Continue to Outsource HR and Payroll Services.
Topics:



Related Articles
Compania Minera Disputada de las Condes. (Panorama: Chile).(acquired from Exxon Mobil by Anglo American)(Brief Article)
Hot growth companies.(Hot Companies)(Illustration)
Top 100 mergers and acquisitions in Latin America.(Table)
The hot 50: Latin America's fastest-growing small companies redline their way to profits.
Money train: high commodity prices, high demand and production ramping up all around. For Latin America's export economies, it doesn't get any better...
The Top 500 companies in Latin America.(Cover Story)
Index.(Illustration)
Top 500 companies in Latin America.(Statistical table)
Feeding the dragon: driven by Chinese demand, Chilean steel maker CAP shifts its business model.(STEEL,Compania de Aceros del Pacifico)
J.N. Precise moving mountains bit by bit.(SPECIAL REPORT: NORTH BAY)(Company overview)

Terms of use | Copyright © 2009 Farlex, Inc. | Feedback | For webmasters | Submit articles