Printer Friendly
The Free Library
19,604,538 articles and books
Member login
User name  
Password 
 
Join us Forgot password?

Cheniere Energy Partners Announces Open Season on Proposed Louisiana Natural Gas Header.


HOUSTON -- Cheniere Energy Partners, L.P. (AMEX AMEX

See: American Stock Exchange
:CQP CQP Certificat de Qualification Professionnelle
CQP California QSO Party
CQP Corpus Query Processor
CQP Complete Quality Process
CQP Cursos de Qualificação Profissional
CQP Center on Quality Policing
CQP Capacitor Qualification Program
) announced today that it is holding a non-binding open season for a proposed new natural gas transportation project called the Louisiana Natural Gas Header. This project would link growing demand markets in the Southeast with new incremental natural gas supplies sourced from multiple LNG LNG (liquefied natural gas): see under natural gas.  import terminals existing and under construction in and around Louisiana. The Louisiana Natural Gas Header would also be able to interconnect with existing pipeline infrastructure, providing shippers with access to wellhead well·head  
n.
1. The source of a well or stream.

2. A principal source; a fountainhead.

3. The structure built over a well.


wellhead
Noun

1.
 natural gas supply sources, including offshore, onshore conventional and recently developed unconventional resources.

As currently contemplated, the pipeline would involve the construction of approximately 330 miles of up to 42-inch diameter pipeline commencing at a point in Beauregard Parish near Dequincy, Louisiana DeQuincy is the northernmost city in Calcasieu Parish, Louisiana, United States. The population was 3,398 at the 2000 census. Geography
DeQuincy is located at  (30.450915, -93.435613)GR1.
 to a point of interconnect with the Florida Gas Transmission Florida Gas Transmission is a natural gas pipeline which brings gas from Texas, Louisiana, Mississippi, and Alabama into Florida. It is owned by 50% by Southern Natural Gas and 50% by CrossCountry Energy. Its FERC code is 34.  pipeline near its Station 11 in Mobile County, Alabama Mobile County is a county of the U.S. state of Alabama. Its name is in honor of a tribe of Indians, the Maubila tribe (see Mobilian). As of 2003 its population was 399,747. Its county seat is Mobile. . Cheniere anticipates that the project could be placed into service as early as mid 2010.

"By 2010, nearly 10 Bcf/d of LNG regasification capacity will be placed into service in Southwest Louisiana and neighboring Southeast Texas. Combining new incremental supply with traditional production area access, the Louisiana Natural Gas Header will offer shippers supply diversity unlike any other greenfield project opportunity," said Stan Horton, President and COO. "This project would also alleviate increasing natural gas demand in the Southeast primarily driven by electric generation. In recent months, the Florida Public Service Commission Florida Public Service Commission (FPSC) is an independent regulatory agency serving the public of Florida by managing its public utilities such as telecommunications, electricity, natural gas, water, and wastewater.  has rejected proposals for two new ultra-supercritical pulverized pul·ver·ize  
v. pul·ver·ized, pul·ver·iz·ing, pul·ver·iz·es

v.tr.
1. To pound, crush, or grind to a powder or dust.

2. To demolish.

v.intr.
 coal generation units representing nearly 2,000 megawatts of new capacity planned to meet near-term demand growth. Over the next ten-year planning horizon Planning horizon

The length of time a model or investor or plan projects into the future.
, incremental natural gas necessary to satisfy new electric generation in the Florida market alone is very conservatively estimated at 1 Bcf/d."

Cheniere Energy Partners will hold a non-binding open season from November 15, 2007 to 5:00 p.m. (CST CST
abbr.
1. Central Standard Time

2. convulsive shock treatment


CST Central Standard Time

Noun 1.
) on January 15, 2008 to gauge interest from prospective shippers.

A copy of the open season guidelines and map is available on our website at www.cheniereenergypartners.com.

Cheniere Energy Partners, L.P. is a Delaware limited partnership. Through its wholly-owned subsidiary, Sabine Pass LNG, L.P., the partnership is developing an LNG receiving terminal located in western Cameron Parish, Louisiana Cameron Parish (French: Paroisse de Cameron) is the parish with the most land area in the U.S. state of Louisiana. The parish seat is Cameron and as of 2000, the population is 9,991. It is part of the Lake Charles Metropolitan Statistical Area.  on the Sabine Pass Channel scheduled to commence operations in the second quarter of 2008. Additional information about Cheniere Energy Partners, L.P. may be found on its web site at www.cheniereenergypartners.com.

This press release contains certain statements that may include "forward-looking statements" within the meanings of Section 27A of the Securities Act of 1933 and Section 21E of the Securities Exchange Act of 1934. All statements, other than statements of historical facts, included herein are "forward-looking statements." Included among "forward-looking statements" are, among other things, (i) statements regarding Cheniere Energy Partners' business strategy, plans and objectives, (ii) statements regarding the proposed Louisiana Natural Gas Header, including the benefits it will afford shippers, (iii) statements regarding future levels of LNG imports into North America or sales of natural gas in North America, regardless of the source of such information, or the transportation or other infrastructure related to natural gas or LNG, and (iv) statements expressing beliefs and expectations regarding the development of Cheniere Energy Partners' LNG receiving terminal business. Although Cheniere Energy Partners believes that the expectations reflected in these forward-looking statements are reasonable, they do involve assumptions, risks and uncertainties, and these expectations may prove to be incorrect. Cheniere Energy Partners' actual results could differ materially from those anticipated in these forward-looking statements as a result of a variety of factors, including those discussed in Cheniere Energy Partners' periodic reports that are filed with and available from the Securities and Exchange Commission. You should not place undue reliance on these forward-looking statements, which speak only as of the date of this press release. Other than as required under the securities laws, Cheniere Energy Partners does not assume a duty to update these forward-looking statements.
COPYRIGHT 2007 Business Wire
No portion of this article can be reproduced without the express written permission from the copyright holder.
Copyright 2007, Gale Group. All rights reserved.

 Reader Opinion

Title:

Comment:



 

Article Details
Printer friendly Cite/link Email Feedback
Publication:Business Wire
Date:Nov 12, 2007
Words:657
Previous Article:Globecomm Systems Awarded $9.9 Million U.S. Government Contract to Develop Next Generation IP Modem with ViaSat.
Next Article:United Fuel & Energy Announces Third Quarter 2007 Conference Call Schedule.
Topics:



Related Articles
City committee aims to reduce greenhouse gases.
Honda Soltec Commemorates Opening of Solar Cell Production Plant; Accelerating Honda's Energy Creation Business.
The Practical Power of the Shaman
Prosperity Can Be Easy and Fun!
Rush Home to Rapture!
Surf the Wave of Abundance
Talking Rocks
Tapping Primal Life Force
The Plant Fairy Speaks
12 Vitality Secrets Right Outside Your Door

Terms of use | Copyright © 2012 Farlex, Inc. | Feedback | For webmasters | Submit articles