Printer Friendly
The Free Library
19,573,952 articles and books
Member login
User name  
Password 
 
Join us Forgot password?

Cadiz Provides Progress Report on Water Program in Letter to Shareholders.


SANTA MONICA Santa Monica (săn`tə mŏn`ĭkə), city (1990 pop. 86,905), Los Angeles co., S Calif., on Santa Monica Bay; inc. 1886. Tourism and retailing are important, and the city has motion-picture, biotechnology, and software industries. , Calif.--(BUSINESS WIRE)--Sept. 14, 1999--

Cadiz Inc. (Nasdaq:CLCI CLCI Dichlorodimethyl Ether ) Tuesday announced that it issued the following letter to shareholders:

Dear Shareholder,

Once again, we are pleased to provide our shareholders with a status report on the Cadiz Groundwater Storage and Dry-Year Supply Program ("the Program"), a cooperative water management program between Cadiz Inc. ("the Company") and the Metropolitan Water District of Southern California The Metropolitan Water District of Southern California is the largest bulk water supplier for municipal use in the world. The name is usually shortened to the "Metropolitan Water District" or simply "MWD".  ("Metropolitan") that seeks to better manage Southern California's Colorado River Colorado River

River, south-central Argentina. Its major headstreams, the Grande and Barrancas rivers, flow southward from the Andes Mountains and meet to form the Colorado near the Chilean border. It flows southeastward across northern Patagonia and the southern Pampas.
 resources.

Since our last shareholder update, distributed in January 1999, the Company and Metropolitan have accomplished a significant amount of work in completing technical studies and conducting the environmental review process, all of which are necessary for the execution of a final agreement. As such, we thought it was an appropriate time to highlight the most recent developments and outline our next steps.

As you will recall, in July 1998, Metropolitan and the Company executed Principles and Terms for Agreement ("Principles"), which outlined the Program's potential capacity and costs, and jointly appropriated $4 million to conduct geotechnical, hydrological hy·drol·o·gy  
n.
The scientific study of the properties, distribution, and effects of water on the earth's surface, in the soil and underlying rocks, and in the atmosphere.
 and engineering studies, as well as environmental documentation. We are greatly encouraged by the results of the technical studies and progress on the preparation of the environmental documentation. In fact, these studies have determined that the Program is capable of performing well beyond our initial expectations, while staying within our original cost estimates.

Finally, this progress is timely since representatives of local, state and federal agencies continue to negotiate California's 4.4 Plan, a program that outlines how California will live within its entitled en·ti·tle  
tr.v. en·ti·tled, en·ti·tling, en·ti·tles
1. To give a name or title to.

2. To furnish with a right or claim to something:
 allocation The apportionment or designation of an item for a specific purpose or to a particular place.

In the law of trusts, the allocation of cash dividends earned by a stock that makes up the principal of a trust for a beneficiary usually means that the dividends will be treated as
 of Colorado River water. Groundwater storage and dry-year supply programs, such as the Cadiz Program, will be essential components within the California 4.4 Plan and will play an integral role in helping Metropolitan address future water demands.

As the Company moves forward with implementation of the Program, we will continue to distribute these updates in order to keep our shareholders appraised of material events. We hope you find them of value, and look forward to hearing your comments. In addition, we look forward to providing additional information regarding our agricultural operations and other water development programs during our upcoming report on the Company's third quarter results.

If you have further questions regarding the Program or are new to the Company, please contact our office for a corporate information kit or visit our web site at www.cadizinc.com. As always, thank you for your continued interest and support.

Yours sincerely,

Keith Brackpool

President & Chief Executive Officer

-0-

Cadiz Groundwater Storage & Dry-Year Supply Program

Progress and Milestones

Program Capacity Is Significantly Increased

Geotechnical studies confirm that the groundwater basin will support storage and dry-year supply levels above the minimum expectations contained in the Principles. In addition, as previously reported, optimization optimization

Field of applied mathematics whose principles and methods are used to solve quantitative problems in disciplines including physics, biology, engineering, and economics.
 studies have also determined that the Program capital facilities (pipeline, pumping plant, and spreading basins) can provide approximately 50% more capacity than previously outlined, while remaining below the original $150 million cost estimate. The Program will be able to convey, for either storage or supply operations, up to 145,000 acre-feet of water per year, in comparison to earlier estimates of 100,000 acre-feet per year.

This enhanced performance, combined with the increased capacity of the groundwater basin, will now allow the Program to store even greater amounts of Colorado River water. Accordingly, the Program's overall scope has expanded. Metropolitan will now store a minimum of 700,000 acre-feet of Colorado River water within the first 20 years of the Program, up from the 500,000 acre-feet originally estimated. In addition, Metropolitan's minimum purchase of 1,100,000 acre-feet of existing groundwater will increase to 1,500,000 acre-feet during the 50-year term of the agreement, in accordance Accordance is Bible Study Software for Macintosh developed by OakTree Software, Inc.[]

As well as a standalone program, it is the base software packaged by Zondervan in their Bible Study suites for Macintosh.
 with the safe operation of the groundwater basin.

Pilot Spreading Basin Project Is Operational And Yielding

Positive Results

Since March 1999, a pilot spreading basin project, which consists of a high-yield production well, eleven monitoring wells, and two 2.5-acre spreading basins, has been operational. Designed to test the storage and extraction of water, the project also analyzed an·a·lyze  
tr.v. an·a·lyzed, an·a·lyz·ing, an·a·lyz·es
1. To examine methodically by separating into parts and studying their interrelations.

2. Chemistry To make a chemical analysis of.

3.
 infiltration infiltration /in·fil·tra·tion/ (in?fil-tra´shun)
1. the pathological diffusion or accumulation in a tissue or cells of substances not normal to it or in amounts in excess of the normal.

2. infiltrate (2).
 rates, erosion control Erosion control is the practice of preventing or controlling wind or water erosion in agriculture, land development and construction. This usually involves the creation of some sort of physical barrier, such as vegetation or rock, to absorb some of the energy of the wind or water , and the design and operation of the future spreading basins. Information obtained from this project has also exceeded all expectations, specifically the rapid rate at which water percolates into the underlying aquifer aquifer (ăk`wĭfər): see artesian well.
aquifer

In hydrology, a rock layer or sequence that contains water and releases it in appreciable amounts.
 system.

Phase I of Environmental Review Process Is Successfully Complete

According to according to
prep.
1. As stated or indicated by; on the authority of: according to historians.

2. In keeping with: according to instructions.

3.
 state and federal environmental laws, an Environmental Impact Report/Environmental Impact Statement (EIR/EIS) that considers, documents and identifies mitigation MITIGATION. To make less rigorous or penal.
     2. Crimes are frequently committed under circumstances which are not justifiable nor excusable, yet they show that the offender has been greatly tempted; as, for example, when a starving man steals bread to satisfy
 measures for potential environmental effects from the Program must be prepared by Metropolitan and the U.S. Bureau of Land Management. Prior to the preparation and circulation of a Draft EIR/EIS, a series of procedural requirements, such as field surveys and public meetings, must be completed. This process is well underway and characterized char·ac·ter·ize  
tr.v. character·ized, character·iz·ing, character·iz·es
1. To describe the qualities or peculiarities of: characterized the warden as ruthless.

2.
 below in three main phases:

I. Commence environmental analysis

Prepare & Circulate cir·cu·late  
v. cir·cu·lat·ed, cir·cu·lat·ing, cir·cu·lates

v.intr.
1. To move in or flow through a circle or circuit: blood circulating through the body.

2.
 Notice of Intent/Notice of Preparation

(NOI/NOP)

45-day Public Comment Period

II. Prepare & Circulate Draft EIR/EIS

60-Day Public Comment Period

III. Prepare & Circulate Final EIR/EIS

Completed all field studies and surveys analyzing

environmental resources

Published NOI/NOP and distributed to stakeholder stakeholder n. a person having in his/her possession (holding) money or property in which he/she has no interest, right or title, awaiting the outcome of a dispute between two or more claimants to the money or property.  groups and

governmental agencies

Conducted first round of public meetings

Provided detailed program briefing to more than 200

representatives from stakeholder groups and governmental

agencies

Closed 45-day public comment period

Phase II of Environmental Review Process Is Underway

Concluding preparation of Draft EIR/EIS

Scheduled publication of Draft EIR/EIS for Fall 1999

Scheduling second round of public meetings

Permitting Process Required For Construction And Operation Of Program Has Commenced

Annual Program Payments Have Been Addressed

The parties have now structured annual payment terms for the committed minimum transfer of 1,500,000 acre-feet of existing groundwater.

Metropolitan will purchase the first 400,000 acre-feet in two installments -- $44 million payable upon environmental certification and the balance of $48 million, subject to adjustment for the water price index, payable upon completion of construction. Finally, Metropolitan will commit to purchase the additional 1,100,000 acre-feet at the earlier of delivery or in annual 40,000 acre-feet increments commencing at the start of operations.

With the increase in performance, the unit cost of water remains consistent with the previously approved Principles.

Final Agreement To Be Presented To Respective Boards

Information obtained through the environmental analysis and technical studies, as well as addressing annual program payments, is critical to documenting a final agreement between the two program partners. With this information in hand, a final agreement, which will be contingent upon Adj. 1. contingent upon - determined by conditions or circumstances that follow; "arms sales contingent on the approval of congress"
contingent on, dependant on, dependant upon, dependent on, dependent upon, depending on, contingent
 completion of the environmental review process, is in the final phases of documentation and will be brought to the program partners' respective Boards for approval in the latter part of this year.

Forward-looking statements forward-looking statement

A projected financial statement based on management expectations. A forward-looking statement involves risks with regard to the accuracy of assumptions underlying the projections.
 contained within this update are subject to significant risks and uncertainties, including statements related to the future operating and financial performance of the Company. Although the Company believes that the expectations reflected in its forward-looking statements are reasonable, it can give no assurance that such expectations will prove to be correct. Factors that could cause actual results or events to differ materially from those reflected in the Company's forward-looking statements include price and yield fluctuations in the agricultural operations, seasonality, timing and terms of various approvals required to complete the Program, and other factors and considerations detailed in the Company's Securities and Exchange Commission filings.
COPYRIGHT 1999 Business Wire
No portion of this article can be reproduced without the express written permission from the copyright holder.
Copyright 1999, Gale Group. All rights reserved. Gale Group is a Thomson Corporation Company.

 Reader Opinion

Title:

Comment:



 

Article Details
Printer friendly Cite/link Email Feedback
Publication:Business Wire
Geographic Code:1USA
Date:Sep 14, 1999
Words:1220
Previous Article:sixdegrees Names Contenders In Advertising Agency Review.
Next Article:Mark IV Reports Second Quarter Results.



Related Articles
LAS VIRGENES TESTS NEW REPORT CARDS.

Terms of use | Copyright © 2012 Farlex, Inc. | Feedback | For webmasters | Submit articles