Brisas Progress Report.


Business Editors

SPOKANE, Wash.--(BUSINESS WIRE)--April 20, 2004

Gold Reserve Inc. (AMEX AMEX

See: American Stock Exchange
:GRZ GRZ Government of the Republic of Zambia
GRZ Graz, Austria - Thalerhof (Airport Code) 
) (TSX TSX Toronto Stock Exchange (TSE before April, 2002)
TSX Transfer from Stack Pointer to Index
TSX True Space Extension
:GRZ) is pleased to report on the status and work being performed at its Brisas gold and copper project located in Southeastern Venezuela.

Kvaerner Metals U.S. Inc., a subsidiary of the international engineering and construction services group Aker Kvaerner, along with Vector Colorado LLC (Logical Link Control) See "LANs" under data link protocol.

LLC - Logical Link Control
 and Pincock Allen & Holt are making substantial progress with their work associated with our bankable bank·a·ble  
adj.
1. Acceptable to or at a bank: bankable funds.

2. Guaranteed to bring profit: a bankable movie star.
 feasibility study The analysis of a problem to determine if it can be solved effectively. The operational (will it work?), economical (costs and benefits) and technical (can it be built?) aspects are part of the study. Results of the study determine whether the solution should be implemented. .

Kvaerner is currently evaluating a wide range of possible plant throughput tonnages ranging from 20,000 to 70,000 tonnes per day. The base case established in our "pre-feasibility study" utilized 50,000 tonnes per day throughput, resulting in an estimated 362,000 ounces of annual gold production. Early estimates using plant throughput of 70,000 tonnes per day, result in approximately 500,000 ounces of gold production per year.

SGS SGS Société Générale de Surveillance
SGS Symantec Gateway Security (appliance)
SGS School of Graduate Studies
SGS Subgrid Scale
SGS Singapore Government Securities
SGS Shell Global Solutions
 Lakefield Research Canada expects to complete the flotation phase of the 700 tonne bulk sample later this month. The objective of this test is to confirm gold and copper recoveries utilizing flotation and generate sufficient gold-copper concentrate for testing utilizing the pressure oxidation process. Early flotation results are confirming improved gold and copper recoveries compared to test work completed during the pre-feasibility study.

Also, Kvaerner is evaluating an optimum processing plant by studying three processing plant alternatives. Each alternative commences with crushing, grinding and flotation of sulfide concentrates and continues by 1) direct shipment of the gold-copper concentrates to an off-site smelter, 2) processing of concentrates through a high temperature pressure oxidation (HTPOX) process to produce copper cathodes on-site, and 3) processing concentrates through the Cominco Engineering Services Limited (CESL CESL Contact Etch Stop Layer ) process to also produce copper cathodes on-site. The feasibility study will fully evaluate two of the three processing options and the Company expects to make a decision during May as to the preferred alternatives.

Doug Belanger, President of the Company, said, "We anticipate test results for HTPOX and CESL may be quite similar, however HTPOX is a commercially proven process. Also, as a result of significantly reduced long-term concentrate treatment and refining charges and other potential benefits, the bankable feasibility study may ultimately conclude that processing concentrates at an off-site smelter is the most economic alternative for the development of the Brisas project. The dynamics of the project have been significantly improved with the rise in copper prices, with copper comprising as much as 30% of estimated project revenues."

The latest phase of development drilling at Brisas will be completed in approximately two weeks. The drilling program, originally scheduled for 11,500 meters, has been increased to 15,000 meters and the updated Brisas resource and reserve model is expected to be finalized See finalization.  in approximately 2 months. Drilling at Brisas to-date totals over 180,000 meters. Mineral reserves in our pre-feasibility study were calculated using $325 per ounce gold and $0.85 per pound copper and it is anticipated that the final feasibility study will use $350 per ounce of gold and $0.95 per pound of copper with a sensitivity analysis at various prices for gold and copper.

"The primary objectives of the drilling program were to further develop the down dip extension and the southern extension of the ore body and to reclassify Verb 1. reclassify - classify anew, change the previous classification; "The zoologists had to reclassify the mollusks after they found new species"
class, classify, sort out, assort, sort, separate - arrange or order by classes or categories; "How would you
 within the current open pit design, inferred ore tonnes to measured and indicated category for incorporation into the feasibility study. We are extremely pleased with the current results and believe that we have achieved our objectives," said Doug Belanger.

Doug Belanger also said, "The gold and copper mineralization Mineralization
The process by which the body uses minerals to build bone structure.

Mentioned in: Rickets

mineralization,
n the bioprecipitation of an inorganic substance.
 is contained in the Brisas alluvial al·lu·vi·al  
adj.
Of, relating to, or found in alluvium: alluvial soil; alluvial gold.


alluvial
Adjective

of or relating to alluvium

Noun
 and hard rock mining titles or concessions granted to the Company by the Ministry of Energy and Mines. Early last year the Ministry of Energy and Mines approved our operating plan for Brisas. This approval is necessary under the mining law to obtain the Environmental Impact Permit from the Ministry of Environment so that construction and operations can take place. The Company is preparing the Environmental Impact Study and this should be formally submitted to the Ministry of Environment in the near future."

Gold Reserve expects to complete the Brisas bankable feasibility study later this year and make a production decision by the end of the year.

Information regarding Gold Reserve Inc. is located at www.goldreserveinc.com

Certain statements included herein, include those that express management's expectations or estimates of our future performance, constitute "forward-looking statements forward-looking statement

A projected financial statement based on management expectations. A forward-looking statement involves risks with regard to the accuracy of assumptions underlying the projections.
" within the meaning of the United States United States, officially United States of America, republic (2005 est. pop. 295,734,000), 3,539,227 sq mi (9,166,598 sq km), North America. The United States is the world's third largest country in population and the fourth largest country in area.  Private Securities Litigation Reform Act The Private Securities Litigation Reform Act of 1995 (PSLRA) implemented several significant substantive changes affecting certain cases brought under the federal securities laws, including changes related to pleading, discovery, liability, class representation and awards fees and  of 1995. Forward looking statements are necessarily based upon a number of estimates and assumptions that, while considered reasonable by management are inherently subject to significant business, economic and competitive uncertainties and contingencies. We caution that such forward-looking statements involve known and unknown risks, uncertainties and other risk factors that may cause the actual financial results, performance, or achievements of Gold Reserve to be materially different from our estimated future results, performance, or achievements expressed or implied by those forward looking statements. These are discussed in greater detail in Gold Reserve's filings with the U.S. Securities and Exchange Commission at www.sec.gov and the Annual Information Form and other reports filed with Canadian provincial securities commissions at www.sedar.com. Gold Reserve expressly disclaims any intention or obligation to update or revise any forward looking statement whether as a result of new information, events or otherwise.
COPYRIGHT 2004 Business Wire
No portion of this article can be reproduced without the express written permission from the copyright holder.
Copyright 2004, Gale Group. All rights reserved. Gale Group is a Thomson Corporation Company.

 Reader Opinion

Title:

Comment:



 

Article Details
Printer friendly Cite/link Email Feedback
Publication:Business Wire
Geographic Code:1USA
Date:Apr 20, 2004
Words:894
Previous Article:Mitsui and BladeLogic Announce Distribution Agreement; Mitsui's E3 Networks to Become First BladeLogic Reseller in Japan.
Next Article:Moro Corporation Acquires Steel Distribution Business; Deal Will Be Immediately Accretive to Earnings.
Topics:



Related Articles
DOS VIENTOS CENTER HAS NEW NAME IN STORE.
COASTING IN LAGUNA; ESCAPE FOR A DAY OR MORE TO IDYLLIC SEASIDE TOWN.
Ideas take form online. (ArtEd Online).
Ideas take form online. (ArtEd Online).
LILIES OF THE FIELD SYMBOLIC EASTER FLOWER BLOOMS APLENTY.
Luis Barragan.
First PAUA progress report shows positive development.

Terms of use | Copyright © 2012 Farlex, Inc. | Feedback | For webmasters | Submit articles