Printer Friendly
The Free Library
19,585,946 articles and books
Member login
User name  
Password 
 
Join us Forgot password?

Bema Gold Corporation: High Grade Drill Results from the Kupol Property, Russia.


Business Editors

VANCOUVER Vancouver, city, Canada
Vancouver, city (1991 pop. 471,844), SW British Columbia, Canada, on Burrard Inlet of the Strait of Georgia, opposite Vancouver Island and just N of the Wash. border.
, British Columbia--(BUSINESS WIRE)--Sept. 8, 2003

Bema Gold Bema Gold Corporation is a Vancouver, British Columbia based intermediate gold producer with operating mines and development projects in Russia, South Africa, Chile and Canada.  Corporation ("Bema") announces additional high-grade High-grade

Credit quality of AAA or AA.


high-grade

Of, relating to, or being a bond with little risk of default on the part of the issuer. High-grade is usually reserved for bonds rated AAA or AA by the rating services.
 drill results from the Kupol Property in Chukotka Chukotka may refer to:
  • Chukchi Peninsula, the northeastern extremity of Asia in the northern part of the Russian Far East
  • Chukotka Autonomous Okrug, a federal subject of Russia located on that peninsula
  • 2509 Chukotka, an asteroid
, Far East Russia Russia, officially the Russian Federation, Rus. Rossiya, republic (2005 est. pop. 143,420,000), 6,591,100 sq mi (17,070,949 sq km). . A total of 130 holes totaling 17,052 metres, have been drilled on the property to date confirming that the Kupol Property hosts a multi-million ounce ounce, in zoology
ounce, in zoology: see leopard.
ounce, unit of measurement
ounce: see English units of measurement.
 gold and silver deposit. The Kupol mineralized min·er·al·ize  
v. min·er·al·ized, min·er·al·iz·ing, min·er·al·iz·es

v.tr.
1. To convert to a mineral substance; petrify.

2. To transform a metal into a mineral by oxidation.

3.
 epithermal vein system has now been traced for 3.5 kilometres of strike length and gold mineralization Mineralization
The process by which the body uses minerals to build bone structure.

Mentioned in: Rickets

mineralization,
n the bioprecipitation of an inorganic substance.
 has been intercepted over 2650 metres of drilled strike length to a depth of at least 250 metres. The system remains open along strike to the north and south, and to depth. Please refer to www.bema.com for a drill hole location map and a long section of the Kupol property.

Assay ASSAY. A chemical examination of metals, by which the quantity of valuable or precious metal contained in any mineral or metallic mixture is ascertained. 2. By the acts of Congress of March 3, 1823, 3 Story's L. U. S. 1924; of June 25, 1834, 4 Shars. cont. Story's L. U. S.  results have been received for the first 116 holes (56 of which were previously released). The results from holes 57 to 116 continue to confirm grade continuity and extend mineralization in the four contiguous zones 1. A maritime zone adjacent to the territorial sea that may not extend beyond 24 nautical miles (nms) from the baselines from which the breadth of the territorial sea is measured. ; the Big Bend Big Bend

A region of southwest Texas on the Mexican border in a triangle formed by a bend in the Rio Grande. The area includes deep river canyons, desert wilderness, mountains rising to 2,386.
 Zone, the Central Zone, the North Zone and the South Zone. In addition, the new results have extended the strike length of the highest grade Big Bend Zone by a further 150 metres to the South and to a depth of at least 250 metres. In the Central Zone, hole 102 intersected a new vein some 60 metres to the east of the main Kupol structure and in the North Zone hole, 86 returned the best drill intercept intercept

in mathematical terms the points at which a curve cuts the two axes of a graph.
 on the property to date.

Detailed assay results from the new holes are summarized by zone below. Drill hole locations, a summary of Bema's lab procedures and QAQC QAQC Quality Assurance/Quality Control
QAQC Quality Assurance/Quality Checks (US DoD) 
 (Quality Assurance Quality Control) are on the last page.

Big Bend Zone

Thirteen additional holes were drilled in the Big Bend Zone which is located at a flexure flexure /flex·ure/ (flek´sher) a bend or fold; a curvation.

caudal flexure  the bend at the aboral end of the embryo.

cephalic flexure  the curve in the midbrain of the embryo.
 in the main structure and hosts some of the most significant intersections to date. Recent drilling focused on stepping out along strike to the south and at depth. The zone remains as a single wide high grade ore ore, metal-bearing mineral mass that can be profitably mined. Nearly all rock deposits contain some metallic minerals, but in many cases the concentration of metal is too low to justify mining the ore.  shoot which now extends over at least 650 metres of strike length and to a depth of at least 250 meters. Some highlights of the new Big Bend drill results are: hole 113 which intersected 9.8 metres averaging 77.1 grams per tonne tonne

measure of weight or mass; 1 tonne=1000 kg. See also ton.
 (g/t) gold and 949.9 g/t silver; hole 111 which intersected 17.9 metres averaging 37.4 g/t gold and 371.6 g/t silver; and hole 108 which intersected 10 metres averaging 32.7 g/t gold and 596.5 g/t silver at a depth of 250 metres. Further drilling this year on the Big Bend Zone will consist of additional 100 metre metre

In poetry, the rhythmic pattern of a poetic line. Various principles have been devised to organize poetic lines into rhythmic units. Quantitative verse, the metre of Classical Greek and Latin poetry, measures the length of time required to pronounce syllables,
 drill step-outs and some infill in·fill  
n.
1. The use of vacant land and property within a built-up area for further construction or development, especially as part of a neighborhood preservation or limited growth program.

2.
 holes and further drilling to depth. Assay results from all the new holes drilled on the Big Bend Zone to date are listed below.


---------------------------------------------------------------------
BIG BEND HOLE #   FROM      TO  LENGTH  GOLD g/t  SILVER g/t COMMENTS
---------------------------------------------------------------------
KP03-52-A       153.75  177.00   23.25     29.60      404.97
---------------------------------------------------------------------
 Includes       154.30  167.60   13.30     45.02      677.12
---------------------------------------------------------------------
KP03 - 59        20.20   26.90    6.70      9.95      199.39
---------------------------------------------------------------------
KP03 - 61        26.30   27.30    1.00     11.98       91.98
---------------------------------------------------------------------
 And             39.20   44.30    5.10      5.50       42.54
---------------------------------------------------------------------
KP03 - 62        47.55   55.05    7.50     21.49      178.98
---------------------------------------------------------------------
 Includes        47.55   49.55    2.00     66.70      618.90
---------------------------------------------------------------------
KP03 - 66        94.40  102.60    8.20     46.46      486.73
---------------------------------------------------------------------
 Includes-       96.30  100.90    4.60     72.27      775.25
---------------------------------------------------------------------
KP03 - 68        11.10   20.12    9.02      8.74       83.55
---------------------------------------------------------------------
 And             29.80   41.40   11.60     40.10      312.68
---------------------------------------------------------------------
KP03 - 97       281.75  293.60   11.85      8.96       96.60
---------------------------------------------------------------------
KP03 - 101       99.00  101.00    2.00     19.69       51.98
---------------------------------------------------------------------
KP03 - 103      228.00  229.90    1.90      4.73       16.00
---------------------------------------------------------------------
KP03 - 108      232.70  242.70   10.00     32.67      596.28
---------------------------------------------------------------------
KP03 - 111      116.00  133.90   17.90     37.41      371.61
---------------------------------------------------------------------
 Includes       126.50  133.90    7.40     52.93      541.51
---------------------------------------------------------------------
KP03 - 113       42.50   52.30    9.80     77.05      949.87
---------------------------------------------------------------------
 Includes        44.40   46.20    1.80    291.53     3444.69
---------------------------------------------------------------------
KP03 - 116      133.55  143.37    9.82     37.17      511.40
---------------------------------------------------------------------
 Includes       134.55  138.07    3.52     72.98     1011.64
---------------------------------------------------------------------



Central Zone

Twenty seven additional holes were drilled on the Central Zone in 50 to 100 metre step outs. Significant intercepts exist to a depth of 200 meters below surface and the zone remains open to depth. The Central Zone is contiguous Adjacent or touching. Contrast with fragmentation. See contiguous file.  with, and directly north, of the Big Bend Zone and has been drill tested along a strike length of 800 metres. Significant new intercepts include hole 71 with 12.9 metres of 45.25 g/t gold and 346.47 g/t silver; hole 99 with 5.4 metres of 48.71 g/t gold and 323.07 g/t silver. A new vein was intercepted in hole 102, 60 metres east of the main vein in the hanging wall, and returned 1.0 metre of 102.94 g/t gold and 636.0 g/t silver. This is significant as it represents the first occurrence of another mineralized vein system that will be followed up with additional drilling. Assay results from all of the new holes drilled in the Central Zone are as follows.


---------------------------------------------------------------------
CENTRAL
ZONE HOLE #       FROM      TO  LENGTH  GOLD g/t  SILVER g/t COMMENTS
---------------------------------------------------------------------
KP03 - 58                                                         NSV
---------------------------------------------------------------------
KP03 - 60        81.40   83.70    2.30      5.40       66.95
---------------------------------------------------------------------
KP03 - 64        61.20   66.30    5.10      5.27       47.89
---------------------------------------------------------------------
 And             71.60   72.90    1.30     18.31      475.59
---------------------------------------------------------------------
KP03 - 65                                                         NSV
---------------------------------------------------------------------
KP03 - 67        32.00   40.55    8.55     39.34      313.67
---------------------------------------------------------------------
KP03 - 69        35.65   40.60    4.95      6.70       80.62
---------------------------------------------------------------------
 Includes        35.65   37.80    2.15     12.49      151.56
---------------------------------------------------------------------
KP03 - 71        84.90   87.90    3.00     13.95      182.17
---------------------------------------------------------------------
 And            114.70  127.60   12.90     45.25      346.47
---------------------------------------------------------------------
KP03 - 72        91.55  102.70   11.15      6.79       54.62
---------------------------------------------------------------------
 Includes        93.05   95.20    2.15     24.15      112.59
---------------------------------------------------------------------
KP03 - 73         4.20   33.50   29.30     14.25      113.40
---------------------------------------------------------------------
 Includes         7.60   15.30    7.70     37.57      329.59
---------------------------------------------------------------------
KP03 - 74        31.90   38.00    6.10     15.87      196.19
---------------------------------------------------------------------
 And             44.50   47.25    2.75     44.15      154.17
---------------------------------------------------------------------
KP03 - 75       136.20  139.20    3.00     13.47      177.60
---------------------------------------------------------------------
 And            152.20  156.00    3.80     17.42      579.38
---------------------------------------------------------------------
KP03 - 76        78.30   80.50    2.20     13.36       93.55
---------------------------------------------------------------------
KP03 - 78        47.60   49.00    1.40     10.13      176.85
---------------------------------------------------------------------
KP03 - 79        46.00   56.50   10.50      6.37      143.61
---------------------------------------------------------------------
 Includes        54.20   56.50    2.30     20.70      485.09
---------------------------------------------------------------------
KP03 - 81        14.50   18.50    4.00     19.84      179.79
---------------------------------------------------------------------
KP03 - 82                                                      Nsv In
                                                             front of
                                                                 vein
---------------------------------------------------------------------
KP03 - 83        44.10   49.80    5.70     28.58      276.58
---------------------------------------------------------------------
KP03 - 89        38.80   39.62    0.82      2.84       41.88
---------------------------------------------------------------------
KP03 - 91       175.45  181.15    5.70     12.80      173.87
---------------------------------------------------------------------
 Includes:      176.00  177.30    1.30     34.68      520.18
---------------------------------------------------------------------
KP03 - 92       140.00  143.10    3.10     23.42      644.13
---------------------------------------------------------------------
KP03 - 93       309.00  313.40    4.40      5.03       93.57
---------------------------------------------------------------------
KP03 - 95       234.85  240.75    5.90      4.45      102.63
---------------------------------------------------------------------
KP03 - 99       225.50  230.90    5.40     48.71      323.07
---------------------------------------------------------------------
 Includes       225.95  227.60    1.65    144.28      739.11
---------------------------------------------------------------------
KP03 - 102      245.85  246.85    1.00    102.94      636.00      New
                                                                 vein
---------------------------------------------------------------------
KP03 - 107      265.30  268.00    2.70      2.09       12.70
---------------------------------------------------------------------
Note: Hole 85 and 114 abandoned.
Note: No Significant Values (NSV)



North Zone

The North Zone extends at least 350 metres north of, and is contiguous to, the Central Zone. The previously discovered high grade shoot in the North Zone has been better defined by several hole including holes 86 which returned 33.5 metres of 32.76 g/t gold and 406.24 g/t silver and hole 77 with 11.40 metres of 20.01 g/t gold and 303.53 g/t silver. The North Zone remains open at depth and appears to be offset to the north by an east -west fault that may have down-dropped the vein structure. Four holes drilled north of the fault, in what is called the North Extension Zone, intercepted very intensely clay-altered volcanics with low temperature stringer string·er  
n.
1. One that strings: a stringer of beads.

2. Architecture
a. A long heavy horizontal timber used as a support or connector.

b. A stringboard.
 veins. Future exploration will test the Northern Extention Zone under the clay clay, common name for a number of fine-grained, earthy materials that become plastic when wet. Chemically, clays are hydrous aluminum silicates, ordinarily containing impurities, e.g., potassium, sodium, calcium, magnesium, or iron, in small amounts.  alteration Modification; changing a thing without obliterating it.

An alteration is a variation made in the language or terms of a legal document that affects the rights and obligations of the parties to it.
.

Assay results from all of recent holes drilled in the North Zone are as follows:


---------------------------------------------------------------------
NORTH
ZONE HOLE #       FROM      TO  LENGTH  GOLD g/t  SILVER g/t COMMENTS
---------------------------------------------------------------------
KP03 - 70        64.50   65.20    0.70      7.66       94.06
---------------------------------------------------------------------
 And             74.30   74.90    0.60      7.50      143.02
---------------------------------------------------------------------
KP03 - 77        80.80   92.20   11.40     20.01      303.53
---------------------------------------------------------------------
 Includes        89.40   91.60    2.20     71.82     1075.34
---------------------------------------------------------------------
KP03 - 84        20.40   30.55   10.15     14.24       37.95
---------------------------------------------------------------------
 Includes        26.75   30.55    3.80     23.24       34.10
---------------------------------------------------------------------
 Plus            47.25   49.60    2.35     13.23       90.66
---------------------------------------------------------------------
KP03 - 86         8.20   41.70   33.50     32.76      406.24
---------------------------------------------------------------------
 Includes        26.10   36.60   10.50     94.23     1204.67
---------------------------------------------------------------------
KP03 - 88        33.40   34.40    1.00      8.84      182.82
---------------------------------------------------------------------
KP03 - 90        83.50  107.30   23.80     10.81      173.59
---------------------------------------------------------------------
 Includes:       92.20   95.20    3.00     28.53      306.51
---------------------------------------------------------------------
KP03 - 90A                                                     Assays
                                                              Pending
---------------------------------------------------------------------
KP03 - 115       29.50   35.20    5.70     20.78      878.35
---------------------------------------------------------------------
 Includes        31.50   32.50    1.00     51.60     1329.98
---------------------------------------------------------------------



Note: Hole 77 and 90 had very poor core recovery and will be re-drilled to obtain a more representative sample.

North Extension Zone - All holes intersected intense clay alteration.


---------------------------------------------------------------------
KP03 - 94                                                         NSV
---------------------------------------------------------------------
KP03 - 98                                                         NSV
---------------------------------------------------------------------
KP03 - 105                                                        NSV
---------------------------------------------------------------------
KP03 - 109                                                        NSV
---------------------------------------------------------------------
Note: No Significant Values (NSV)



South Zone

The South Zone extends for at least 600 metres to the south of the Big Bend Zone. Three additional holes were drilled to further test the ore shoot defined by previously released holes 42A and 31, with grades of 33.26 g/t gold and 356.74 g/t silver over 7.5 metres in hole 42A and 14.64 g/t gold and 129.07 g/t silver over 6.8 metres in hole 31. Hole 63 undercut undercut,
n 1. the portion of a tooth that lies between its height of contour and the gingivae, only if that portion is of less circumference than the height of contour.
2.
 hole 42A, but was cut-off cut-off Anesthesiology The point at which elongation of the carbon chain of the 1-alkanol family of anesthetics results in a precipitous drop in the anesthetic potential of these agents–eg, at > 12 carbons in length, there is little anesthetic activity,  by a dyke shortly after intersecting in·ter·sect  
v. in·ter·sect·ed, in·ter·sect·ing, in·ter·sects

v.tr.
1. To cut across or through: The path intersects the park.

2.
 the vein.

A series of seven widely spaced holes were drilled south of the South Zone along a mineralized trend called the South Extension Zone. This zone extends another 750 meters south of the South Zone and is defined by alteration, vein float and outcrop. Holes 87 and 96 intersected dykes and did not hit the vein zone. Holes 110 and 112 are believed to be too short and did not intersect In a relational database, to match two files and produce a third file with records that are common in both. For example, intersecting an American file and a programmer file would yield American programmers.  the mineralized structure. The South Zone and South Extension Zone will be further drill tested in 2004.

Assay results from all the recent holes drilled in the South Zone and South Extension Zones are as follows.


---------------------------------------------------------------------
South
Zone HOLE #       FROM      TO  LENGTH  GOLD g/t  SILVER g/t COMMENTS
---------------------------------------------------------------------
KP03 - 57                                                         NSV
---------------------------------------------------------------------
KP03 - 63       104.80  111.70    6.90      4.10       36.28
---------------------------------------------------------------------
 Includes       104.80  105.40    0.60     15.33      133.35
---------------------------------------------------------------------
 And            110.90  111.70    0.80     13.54       77.26
---------------------------------------------------------------------
KP03 - 80        53.00   54.70    1.70      9.48      529.56
---------------------------------------------------------------------
 Plus            59.60   62.80    3.20      6.13       22.04
---------------------------------------------------------------------



---------------------------------------------------------------------
South Extension
HOLE #            FROM      TO  LENGTH  GOLD g/t  SILVER g/t COMMENTS
---------------------------------------------------------------------
KP03 - 87        37.10   37.40    0.30      9.08       83.20
---------------------------------------------------------------------
KP03 - 96                                                         NSV
---------------------------------------------------------------------
KP03 - 100       98.40  100.40    2.00      2.52       96.84
---------------------------------------------------------------------
KP03 - 104       42.90   44.50    1.60      9.13       96.78
---------------------------------------------------------------------
KP03 - 106       41.90   42.20    0.30      3.16       31.90
---------------------------------------------------------------------
KP03 - 110                                                       Dyke
---------------------------------------------------------------------
KP03 - 112                                                  too short
---------------------------------------------------------------------



Note: No Significant Values (NSV NSV Net Sales Value
NSV Nullsoft Streaming Video
NSV Noise Shaped Video (Sony)
NSV No-Scalpel Vasectomy (Chinese puncture technique)
NSV Nationalistische Studentenvereniging
)

A further 9,000 metres of drilling is scheduled to be completed in 2003 on the Kupol Property, weather dependant, utilizing two Canadian Canadian (kənā`dēən), river, 906 mi (1,458 km) long, rising in NE New Mexico. and flowing E across N Texas and central Oklahoma into the Arkansas River in E Oklahoma.  and two Russian Russian

associated in some way with Russia.


Russian blue
a breed of cats with short, dense, silver-tipped blue-colored coat and vivid green eyes.
 rigs. More assay results will be released as they become available.

In addition to drilling, Bema's surface sampling program on the Kupol Property has identified new parallel vein structures that will be drill tested. Bema has also commenced metallurgical met·al·lur·gy  
n.
1. The science that deals with procedures used in extracting metals from their ores, purifying and alloying metals, and creating useful objects from metals.

2.
 test work, baseline The horizontal line to which the bottoms of lowercase characters (without descenders) are aligned. See typeface.

baseline - released version
 engineering, hydrological hy·drol·o·gy  
n.
The scientific study of the properties, distribution, and effects of water on the earth's surface, in the soil and underlying rocks, and in the atmosphere.
 and environmental studies on the Kupol Project.

The Kupol Project is a joint venture between Bema and the government of Chukotka. Bema has the option to purchase a 75% interest in the property from the government.

On behalf of BEMA GOLD CORPORATION

Clive CLIVE

Computer-aided Learning in Veterinary Education. A consortium of six veterinary schools in the United Kingdom providing computer based learning in veterinary undergraduates courses.
 T. Johnson, Chairman, C.E.O., & President

The following table shows the location of the drill holes:

---------------------------------------------------------------------
            LOCATION     LOCATION LOCATION  LENGTH         AZI-
HOLE-ID            X            Y      Z      (m) SECTION MUTH    DIP
---------------------------------------------------------------------
58 KP03
 -052A  29,436,431.4  7,411,743.7  624.4  182.58    1750N  270  -63.5
---------------------------------------------------------------------
63 KP03
 -057   29,436,099.8  7,410,957.4  548.1  102.50     950N  270  -55
---------------------------------------------------------------------
64 KP03
 -058   29,436,340.1  7,412,749.1  646.0   39.40    2750N  270  -55
---------------------------------------------------------------------
65 KP03
 -059   29,436,382.4  7,411,855.6  645.0   59.74    1850N  270  -55
---------------------------------------------------------------------
66 KP03
 -060   29,436,424.3  7,412,500.0  658.1  134.22    2500N  270  -55
---------------------------------------------------------------------
67 KP03
 -061   29,436,398.7  7,411,903.8  649.4   71.93     900N  270  -55
---------------------------------------------------------------------
68 KP03
 -062   29,436,420.8  7,411,950.1  655.4   71.93    1950N  270  -55
---------------------------------------------------------------------
69 KP03
 -063   29,436,224.3  7,411,056.3  533.3  178.20    1050N  270  -55
---------------------------------------------------------------------
70 KP03
 -064   29,436,398.2  7,412,745.3  639.9  114.91    1750N  270  -55
---------------------------------------------------------------------
71 KP03
 -065   29,436,359.0  7,412,748.4  644.3   57.60    2750N  270  -55
---------------------------------------------------------------------
72 KP03
 -066   29,436,420.8  7,411,950.1  655.5  129.54    1950N  270  -70
---------------------------------------------------------------------
73 KP03
 -067   29,436,374.9  7,412,604.3  656.0   81.38    2600N  270  -55
---------------------------------------------------------------------
74 KP03
 -068   29,436,388.8  7,411,986.5  655.6   45.72    1950N  270  -55
---------------------------------------------------------------------
75 KP03
 -069   29,436,377.7  7,412,712.1  643.1   59.45  2712.5N  270  -55
---------------------------------------------------------------------
76 KP03
 -070   29,436,383.6  7,413,004.1  612.1   96.90    3000N  270  -55
---------------------------------------------------------------------
77 KP03
 -071   29,436,453.5  7,411,995.1  655.9  150.57    2000N  264  -58
---------------------------------------------------------------------
78 KP03
 -072   29,436,423.2  7,412,709.6  640.5  135.33  2712.5N  270  -55
---------------------------------------------------------------------
79 KP03
 -073   29,436,372.3  7,412,023.3  656.2   47.55    2025N  270  -55
---------------------------------------------------------------------
80 KP03
 -074   29,436,385.4  7,412,028.3  655.9   53.64    2025N  270  -55
---------------------------------------------------------------------
81 KP03
 -075   29,436,459.1  7,412,712.1  639.9  181.97  2712.5N  270  -55
---------------------------------------------------------------------
82 KP03
 -076   29,436,423.5  7,412,020.3  658.9  113.08    2025N  270  -57
---------------------------------------------------------------------
83 KP03
 -077   29,436,402.3  7,413,048.5  605.9  114.90    3050N  270  -55
---------------------------------------------------------------------
84 KP03
 -078   29,436,386.7  7,412,048.7  657.9   60.35    2050N  270  -58
---------------------------------------------------------------------
85 KP03
 -079   29,436,375.4  7,412,802.4  636.4  102.72    2800N  270  -55
---------------------------------------------------------------------
86 KP03
 -080   29,436,060.6  7,410,892.6  552.1   90.00     900N  270  -55
---------------------------------------------------------------------
87 KP03
 -081   29,436,373.3  7,412,125.8  659.6   25.60    2125N  270  -55
---------------------------------------------------------------------
88 KP03
 -082   29,436,373.1  7,412,223.8  656.3   47.55    2225N  270  -55
---------------------------------------------------------------------
89 KP03
 -083   29,436,413.9  7,412,224.2  657.8   95.40    2225N  270  -55
---------------------------------------------------------------------
90 KP03
 -084   29,436,352.3  7,412,876.4  630.4   75.30    2875N  270  -54.3
---------------------------------------------------------------------
91 KP03
 -085   29,436,430.0  7,412,345.9  664.9   61.26    2350N  270  -55
---------------------------------------------------------------------
92 KP03
 -086   29,436,323.8  7,412,951.2  621.1   66.14    2950N  270  -55
---------------------------------------------------------------------
93 KP03
 -087   29,436,061.7  7,410,805.7  555.9  139.70     800N  270  -55
---------------------------------------------------------------------
94 KP03
 -088   29,436,395.3  7,413,102.9  600.1   65.00    3100N  270  -55
---------------------------------------------------------------------
95 KP03
 -089   29,436,388.0  7,412,500.3  659.3   62.79    2500N  270  -55
---------------------------------------------------------------------
96 KP03
 -090   29,436,367.3  7,412,951.3  615.6  124.05    2950N  270  -55
---------------------------------------------------------------------
97 KP03
 -091   29,436,491.8  7,412,499.4  655.6  215.20    2500N  270  -65
---------------------------------------------------------------------
98 KP03
 -092   29,436,458.1  7,412,598.8  647.3  230.73    2600N  270  -67
---------------------------------------------------------------------
99 KP03
 -093   29,436,584.0  7,412,498.0  643.3  335.89    2500N  270  -65
---------------------------------------------------------------------
100 KP03
 -094   29,436,422.9  7,413,199.3  584.5   95.40    3200N  270  -55
---------------------------------------------------------------------
101 KP03
 -095   29,436,512.8  7,412,598.3  642.3  281.03    2600N  270  -62
---------------------------------------------------------------------
102 KP03
 -096   29,436,045.4  7,410,705.7  564.9   95.00     700N  270  -55
---------------------------------------------------------------------
103 KP03
 -097   29,436,557.7  7,411,906.4  652.5  321.56    1900N  270  -65
---------------------------------------------------------------------
104 KP03
 -098   29,436,447.1  7,413,199.2  582.8   59.70    3200N  270  -55
---------------------------------------------------------------------
105 KP03
 -099   29,436,467.1  7,412,637.1  642.9  255.12    2636N  270  -69
---------------------------------------------------------------------
106 KP03
 -100   29,436,020.0  7,410,557.4  576.9  125.00    1250N  270  -55
---------------------------------------------------------------------
107 KP03
 -101   29,436,422.9  7,411,857.6  646.7  120.09    1850N  270  -60
---------------------------------------------------------------------
108 KP03
 -102   29,436,538.1  7,412,681.2  636.3  381.00    2675N  270  -65
---------------------------------------------------------------------
109 KP03
 -103   29,436,476.2  7,411,800.5  635.3  254.91    1800N  270  -65
---------------------------------------------------------------------
110 KP03
 -104   29,435,987.3  7,410,467.5  555.7  112.00     475N  270  -55
---------------------------------------------------------------------
111 KP03
 -105   29,436,389.8  7,413,199.7  588.1  109.20    3200N  270  -55
---------------------------------------------------------------------
112 KP03
 -106   29,436,012.2  7,410,357.6  542.2  110.00     350N  270  -55
---------------------------------------------------------------------
113 KP03
 -107   29,436,538.1  7,412,681.2  636.3  460.55    2675N  270  -72
---------------------------------------------------------------------
114 KP03
 -108   29,436,469.9  7,411,742.7  628.1  279.20    1750N  270  -63.5
---------------------------------------------------------------------
115 KP03
 -109   29,436,427.9  7,413,289.1  571.7   72.40    3300N  270  -55
---------------------------------------------------------------------
116 KP03
 -110   29,436,035.5  7,410,251.2  533.6  112.00     250N  270  -55
---------------------------------------------------------------------
117 KP03
 -111   29,436,425.3  7,411,801.8  636.1  166.42    1800N  270  -66
---------------------------------------------------------------------
118 KP03
 -112   29,436,051.0  7,410,049.6  519.9  101.20      50N  270  -55
---------------------------------------------------------------------
119 KP03
 -113   29,436,360.9  7,411,651.7  604.8   76.50    1650N  270  -53.5
---------------------------------------------------------------------
120 KP03
 -114   29,436,473.4  7,412,803.4  628.7  241.10    2800N  270  -65
---------------------------------------------------------------------
121 KP03
 -115   29,436,379.2  7,413,050.6  607.6   60.90    3050N  270  -55
---------------------------------------------------------------------
122 KP03
 -116   29,436,385.2  7,411,651.5  605.2  160.32    1650N  270  -71
---------------------------------------------------------------------
123 KP03
 -117   29,436,049.6  7,410,450.8  533.1  150.00     450N  270  -55
---------------------------------------------------------------------
124 KP03
 -118   29,436,468.9  7,411,648.8  611.6  260.91    1650N  270  -58
---------------------------------------------------------------------
125 KP03
 -119   29,436,380.8  7,413,427.9  559.3  103.00    3425N   90  -55
---------------------------------------------------------------------
126 KP03
 -120   29,436,087.0  7,410,550.0  569.0  220.20     550N  270  -55
---------------------------------------------------------------------
127 KP03
 -121   29,436,338.2  7,411,562.0  588.8   80.47    1550N  270  -55
---------------------------------------------------------------------
128 KP03
 -122   29,436,387.0  7,412,650.0  648.5   85.80    2650N  270  -55
---------------------------------------------------------------------
129 KP03
 -123   29,436,363.0  7,411,550.0  588.5  129.24    1550N  270  -62
---------------------------------------------------------------------
130 KP03
 -124   29,436,292.5  7,411,450.0  577.5   84.12    1450N  270  -55
---------------------------------------------------------------------
                                        17052.58
---------------------------------------------------------------------



Bema has installed an on site preparation and fire assay laboratory due to the project's remote location. The lab is managed by an experienced Russian fire assayer and overseen by an independent consultant. Bema has also retained Smee and Associates Consulting Ltd. to ensure the lab is operated to the level of North American North American

named after North America.


North American blastomycosis
see North American blastomycosis.

North American cattle tick
see boophilusannulatus.
 standards and that a comprehensive quality control program is run by the lab. The Kupol lab is operated as an independent lab and no Bema personnel are permitted unsupervised access. Drill samples have been prepped on site under the supervision of the independent North American consultant and reviewed on site by Barry Barry, Welsh Barri, town (1991 pop. 45,053) and port, Vale of Glamorgan, S Wales, on the Bristol Channel. Once a major coal-exporting port, its more diversified export products include cement, flour, and steel products.  Smee who visited the site during lab start-up Start-up

The earliest stage of a new business venture.
. Samples are crushed in two passes within a jaw crusher crusher, machine used to reduce materials such as ore, coal, stone, and slag to particle sizes that are convenient for their intended uses. Crushers operate by slowly applying a large force to the material to be reduced.  to 80 % passing 2 mm. Approximately ap·prox·i·mate  
adj.
1. Almost exact or correct: the approximate time of the accident.

2.
 800 grams are split off the coarse crush crush

A combination commodity trade in which soybean futures are purchased and soybean meal or oil futures are sold. Compare reverse crush.
 and pulverized pul·ver·ize  
v. pul·ver·ized, pul·ver·iz·ing, pul·ver·iz·es

v.tr.
1. To pound, crush, or grind to a powder or dust.

2. To demolish.

v.intr.
 to 95 % passing 150 mesh Refers to an interconnect architecture that cross- connects several devices. See mesh network, wireless mesh network and switch fabric.

(character) mesh - The INTERCAL name for hash.
. A 200 gram pulverized sample is split and packaged for the analytical analytical, analytic

pertaining to or emanating from analysis.


analytical control
control of confounding by analysis of the results of a trial or test.
 lab.

All results released in this news release have been validated val·i·date  
tr.v. val·i·dat·ed, val·i·dat·ing, val·i·dates
1. To declare or make legally valid.

2. To mark with an indication of official sanction.

3.
 by our Quality Control Program (QC) which has been designed in concert with Smee and Associates to meet or exceed the requirements of NI 43-101. This QC program includes the use of certified See certification.  standard reference samples, coarse field blank Lacking something essential to fulfillment or completeness; unrestricted or open. A space left empty for the insertion of one or more words or marks in a written document that will effectuate its meaning or make it legally operative.  material and duplicate DUPLICATE. The double of anything.
     2. It is usually applied to agreements, letters, receipts, and the like, when two originals are made of either of them. Each copy has the same effect.
 sampling. Tom Garagan, Vice President of Exploration, is the Qualified Person for this exploration project.

The Toronto Stock Exchange Toronto Stock Exchange (TSE)

Canada's largest stock exchange, trading approximately 1,200 company stocks and 33 options.
 neither approves nor disapproves the information contained in this News Release. Bema Gold Corporation trades on The Toronto Toronto (tərŏn`tō), city (1998 est pop. 2,400,000), provincial capital, S Ont., Canada, on Lake Ontario. Toronto is the largest city in Canada and since the 1970s has been one of the fastest-changing cities in North America, experiencing  and American stock exchanges This is a list of American stock exchanges. Stock exchanges in Latin America (where Spanish and Portuguese prevail) use the term Bolsa de Valores, meaning 'bag' or 'purse' of 'values'. . Symbol: BGO BGO Bismuth Germanate
BGO Baguio City (Philippines)
BGO Blinding Glimpse of the Obvious
BGO Bergen, Norway - Flesland (Airport Code)
BGO Blue and Gold Officer (United States Naval Academy) 
.

Some of the statements contained in this release are forward-looking statements forward-looking statement

A projected financial statement based on management expectations. A forward-looking statement involves risks with regard to the accuracy of assumptions underlying the projections.
, such as estimates and statements that describe the Company's future plans, objectives or goals, including words to the effect that the Company or management expects a stated condition or result to occur. Since forward-looking statements address future events and conditions, by their very nature, they involve inherent risks and uncertainties. Actual results in each case could differ materially from those currently anticipated in such statements.
COPYRIGHT 2003 Business Wire
No portion of this article can be reproduced without the express written permission from the copyright holder.
Copyright 2003, Gale Group. All rights reserved. Gale Group is a Thomson Corporation Company.

 Reader Opinion

Title:

Comment:



 

Article Details
Printer friendly Cite/link Email Feedback
Publication:Business Wire
Geographic Code:1CANA
Date:Sep 8, 2003
Words:3778
Previous Article:Chartwell Announces Receipt of Alderney Certificate of Prior Approval.
Next Article:Western Silver Extends Gold Zone at Penasquito Outcrop Breccia.
Topics:



Related Articles
Bema Announces Preliminary Mineral Resource for the Kupol Project.
Bema Gold Corporate Update/Notice of Year End Results Conference Call.
Bema Announces Preliminary Economic Assessment for the Kupol Project/Commences Phase II Drill Program.
Bema Arranges US$60 Million Bridge Loan Facility for Kupol Development.
Bema Increases Bridge Loan Facility for the Kupol Development to US$150 Million & Appoints Mandated Lead Arrangers for the Kupol Project Financing.
Bema Gold Corporation: Kupol Drill Results; New Vein Discovered and Extension of Main Vein.
Bema Gold Corporation: Kupol Project Update; Project Loan Financing, 2005 Development Work on Schedule, New Exploration Drill Results Further Expand...
Bema Gold Corporation: 2005 Third Quarter Results.
Bema Gold Corporation: 2005 Gold Production/2006 Production Guidance.
Bema Gold Corporation: 2005 Fourth Quarter and Year End Results.

Terms of use | Copyright © 2012 Farlex, Inc. | Feedback | For webmasters | Submit articles