Printer Friendly
The Free Library
19,607,059 articles and books
Member login
User name  
Password 
 
Join us Forgot password?

BatteryCorp's New Web-Based Service Enables Carriers to Comply with Recent FCC Challenge.


- OMS OMS - Opportunity Management System ([R])-BatteryTrak([R]) Offers Backup Analysis Service in Support of FCC (1) (Federal Communications Commission, Washington, DC, www.fcc.gov) The U.S. government agency that regulates interstate and international communications including wire, cable, radio, TV and satellite. The FCC was created under the U.S.  07-107 -

NEWTON, Mass. -- BatteryCorp Inc., a leading supplier of preventative maintenance products for backup power An additional power source that can be used in the event of power failure. See UPS and backup.


A Half Minute of Backup
This roomful of lead acid batteries stands ready to drain itself entirely in less than a minute.
 systems, today announced a new web-based service that is designed to support the FCC's new ruling, FCC 07-107 Appendix B, which has raised the bar for backup power systems by addressing the length of time that telecommunications providers must be able to provide service on backup power. BatteryCorp's OMS([R]) BatteryTrak([R])allows telecommunications carriers and UPS providers to assess the readiness of battery backup See UPS.  systems and ensure that each will perform to the required standards in an emergency.

According to according to
prep.
1. As stated or indicated by; on the authority of: according to historians.

2. In keeping with: according to instructions.

3.
 industry estimates, there are nearly a million remote transmission and central office facilities in the US telecommunications market, with virtually all of these installations housing some level of battery backup power systems. The challenge for facilities owners and managers is that these batteries die. The question is not will they fail, but when will they fail.

"Preventative battery maintenance has become a strategic imperative for cell tower operators. Yet programs for battery backup systems vary widely," said Jonathan Quint, BatteryCorp President. "We have seen a range of programs that differ not only from company to company but also from market to market within a company. This makes it difficult for an organization to determine the health of its battery plant at any given time, or comply with the new FCC rulings."

OMS - BatteryTrak is technology platform for the preventative maintenance of backup power systems. The patented process is designed to streamline and support the battery assessment process by delivering timely, insightful reporting and predictive analyses of both battery life and runtime reserve. Using a graphical dashboard (1) See Mac Dashboard.

(2) A software-based control panel for one or more applications, network devices or industrial machines. Dashboards display simulated gauges and dials that look somewhat like an automobile dashboard.
 for simple intuitive viewing, OMS BatteryTrak is a web-based service that accepts battery test data from most ohmic ohm  
n.
A unit of electrical resistance equal to that of a conductor in which a current of one ampere is produced by a potential of one volt across its terminals. See Table at measurement.
 testers and remote monitoring (protocol) remote monitoring - (RMON) A network management protocol that allows network information to be gathered at a single computer. Whereas SNMP gathers network data from a single type of Management Information Base (MIB), RMON 1 defines nine additional MIBs that provide a  systems, analyzes the data, generates automated reports and proposals, and delivers the information electronically. It also provides advanced analytics including runtime reserve and predictive failure analysis Predictive Failure Analysis (PFA) is a proprietary IBM technology for monitoring the likelihood of hard disk drives to fail. It was introduced in 1992 in IBM 0662-S1x drive (1052 MB Fast-Wide SCSI-2 disk at 5400 rpm), and was industry's first such technology. .

OMS - BatteryTrak helps monitor battery backup facilities by answering a range of questions that include:

* If the batteries have not failed, what is the status of their health?

* How much capacity do they currently possess? How much capacity will they possess in six months? How much next year?

* If one or two jars are weak, how will it affect the other jars in any given string?

* Should the remediation be to replace only the bad jars, or the entire string?

The actions that are taken, or omitted, have both operational and budgetary ramifications ramifications nplAuswirkungen pl .

FCC Sanctions Need for Backup Monitoring

As a result of Hurricane Katrina Editing of this page by unregistered or newly registered users is currently disabled due to vandalism. , governmental authorities have created rules and regulations aimed at improving responsiveness and mitigating adverse conditions in the event of future emergencies. On June 8, 2007 the FCC approved FCC 07-107 Appendix B Final Rules that mandate the length of time that telecommunication providers must be able to provide service on backup power. The ruling requires telecommunications providers with at least 500,000 subscribers to provide emergency power backup of 24 hours for central offices and 8 hours for remote locations including cell sites.

Availability

OMS(-)BatteryTrakis available immediately.

BatteryCorp has developed a patented process and technology platform for the preventative maintenance of backup power systems. It is a web-based service that accepts battery test data from ohmic testers, analyzes the data, generates automated reports and proposals, and delivers the information electronically. It also provides advanced analytics including runtime reserve and predictive failure analysis. To learn more about the OMS([R] )- BatteryTrak([R] )solution, visit BatteryCorp online at www.BatteryCorp.com.
COPYRIGHT 2007 Business Wire
No portion of this article can be reproduced without the express written permission from the copyright holder.
Copyright 2007, Gale Group. All rights reserved.

 Reader Opinion

Title:

Comment:



 

Article Details
Printer friendly Cite/link Email Feedback
Publication:Business Wire
Date:Aug 20, 2007
Words:597
Previous Article:Fitch Ratings Affirms MoneyGram's IDR at 'BBB'; Outlook Stable.
Next Article:DTN Hires Greg Horstmeier as Production Editor.
Topics:



Related Articles
Airline News - Europe.
Airline News - North America.
Travel & Travel Technology News.
Travel Safety Update.
Company Watch - Air China.
Company Watch - Aer Lingus.
Company Watch - Cathay Pacific Airways.
Company Watch - Delta Air Lines.
Fujitsu and Technology Leaders Release Specification for Federating and Accessing Multi-vendor IT Management Data.
Capitalize on Your Receivables with Invoice Factoring Funding

Terms of use | Copyright © 2012 Farlex, Inc. | Feedback | For webmasters | Submit articles