Printer Friendly
The Free Library
14,734,713 articles and books
Member login
User name  
Password 
 
Join us Forgot password?

Bank's former offices turn into new downtown school.


Families with children moving to downtown Manhattan will now be able to benefit from an important addition to the area's academic establishments--a brand new private institution, Claremont Preparatory School preparatory school: see school.
preparatory school

School that prepares students for entrance to a higher school. In Europe, where secondary education has been selective, preparatory schools have been those that catered to pupils wishing to enter
, has moved into the former Bank of America
See also:  and


Bank of America (NYSE: BAC TYO: 8648 ) is the largest commercial bank in the United States in terms of deposits, and the largest company of its kind in the world.
 office building at 41 Broad St., becoming the first new school in the area in 50 years.

The school, geared mainly toward area residents and the children of local corporate employees, features an academic program spanning from kindergarten to eighth grade and has taken some pains to provide an exciting environment for its students. In the course of a $40 million renovation, Claremont has completely rehabbed the Bank's former office floors into 50 comfortable classrooms, has used the building's several roof layers to build three separate gym areas and turned the basement and sub-basement floors into a pool room and a cafeteria. In addition, Claremont has renovated the Bank's former hall, creating a school auditorium and private event space.

According to according to
prep.
1. As stated or indicated by; on the authority of: according to historians.

2. In keeping with: according to instructions.

3.
 Daniel Koffler, managing director of the downtown auditorium, the building sat vacant for almost 14 years before Claremont took a look at it. Its main appeal was the fact that it was a freestanding free·stand·ing  
adj.
Standing or operating independently of anything else: a freestanding bell tower; a freestanding maternity clinic.
 structure--41 Broad St. is located in the most tightly controlled area In telecommunication, the term controlled area is an area in which uncontrolled movement will not result in compromise of classified information, that is designed to provide administrative control and safety, or that serves as a buffer for controlling access to limited-access areas.  of downtown, just steps away from the New York Stock Exchange New York Stock Exchange (NYSE)

World's largest marketplace for securities. The exchange began as an informal meeting of 24 men in 1792 on what is now Wall Street in New York City.
, and the school's executives were concerned about dealing with too many security issues if they shared a building with a financial services The examples and perspective in this article or section may not represent a worldwide view of the subject.
Please [ improve this article] or discuss the issue on the talk page.
 firm. But they were also impressed that the landlord, Orin Wilf, principal of Garden Commercial Properties, agreed to partially finance the renovation.

Today, the Claremont Preparatory building is almost complete. The school is already in operation, with 55 students, and Koffler expects that it will take little time to fill the remaining 1,145 spots. In the meantime Adv. 1. in the meantime - during the intervening time; "meanwhile I will not think about the problem"; "meantime he was attentive to his other interests"; "in the meantime the police were notified"
meantime, meanwhile
, while the kids are on spring break, Claremont is finishing up a few small details here and there.

When Koffler gives visitors a tour of the school, he first takes them to the new auditorium, a spectacular, cathedral-like space that features Corinthian columns and hand-painted wall murals. In the course of a $2 million restoration, Claremont's construction crew had to install new air-conditioning and lighting systems; eliminate a staircase from the middle of the space that led to a lower floor and remove moisture from the water-logged murals by using hypodermic needles hypodermic needle
n.
1. A hollow needle used with a hypodermic syringe.

2. A hypodermic syringe including the needle.
.

The work was almost as intricate one level lower--the crew had to clear out what used to be the mechanical room and create a 25-meter, three-lane swimming pool. The facility is now ready for operation.

The sub-basement floor, used by the Bank as a vault, has been turned into a cafeteria. Here, Claremont preserved some of the original details--including a heavy metal vault door that now leads from the kitchen to the eating space. According to Koffler, some of the old equipment was too heavy to be removed, but that worked out to the school's advantage--the cafeteria space becomes much more interesting when it is paired with elements of a banking facility.

Many of the original details--including oak wall paneling, fireplaces and floor to ceiling windows had also been preserved on the building's second floor, now used for the school's administrative offices and library. The space, evoking a 1930's style executive office decor, even includes a secret escape door in the former CEO (1) (Chief Executive Officer) The highest individual in command of an organization. Typically the president of the company, the CEO reports to the Chairman of the Board.  room and a Renaissance Revival elevator offering rides between the first and the second floors.

The building's upper levels, however, have all been modernized--Claremont has removed the office cubicles cubicles

individual cow bed spaces separated by half height and half length partitions. Usually located in loose housing cow accommodation in which the cow is free to wander at will.
 to make space for classrooms, lab rooms and community spaces. In an effort to make socializing easier, the classrooms are laid out in a circle around a central meeting area, where the children will inevitably interact with each other during breaks. Each room is now designed for 20 students, complete with computers and an intercom system for the teacher.

The school's main gym--a 5.000 s/f space with a scoreboard and basketball hoops, has been placed on one of the higher floors. According to Koffler, Claremont's crew used one of the building's roof levels to add 12 feet to the ceiling heights. One level up is a smaller gym area here, once all of the equipment is installed, students will be able to practice ballet, yoga yoga (yō`gə) [Skt.,=union], general term for spiritual disciplines in Hinduism, Buddhism, and throughout S Asia that are directed toward attaining higher consciousness and liberation from ignorance, suffering, and rebirth.  and similar exercise routines. Finally, the building's upper roof level has been covered with green turf and surrounded with metal beams and netting to allow the children to safely play in the fresh air.

All in all, the school's executives believe Claremont will be an overwhelming success. The school's tuition is competitive with similar institutions--$26,500 a year--and with all the residential conversions going on downtown, parents are bound to jump at a chance of a local private school.

Designed by Cross & Cross and completed in 1929, 41 Broad St. contains 100,000 s/f of space. The building was originally created to house Conway Department Store. OCV OCV Open Circuit Voltage
OCV Optical Character Verification (EnSeal proprietary document authentication technology)
OCV Out-of-Country Voting
OCV On-Chip Variation
OCV Oil Control Valve (automotive engines) 
 Architects, in cooperation with Cow Bay Contracting and Walwilhal Associates, are the team in charge of the renovation.
COPYRIGHT 2006 Hagedorn Publication
No portion of this article can be reproduced without the express written permission from the copyright holder.
Copyright 2006, Gale Group. All rights reserved. Gale Group is a Thomson Corporation Company.

 Reader Opinion

Title:

Comment:



 

Article Details
Printer friendly Cite/link Email Feedback
Author:Misonzhnik, Elaine
Publication:Real Estate Weekly
Date:Mar 29, 2006
Words:832
Previous Article:Lighthouse gets Coliseum job.(Lighthouse Development Group, LLC gets contract to redevelop the Nassau County Coliseum complex)(Brief article)
Next Article:Related begins makeover of vacant South Bronx site.
Topics:



Related Articles
Industry pioneer recalls grooming today's leaders. (banking industry pioneer Harry Volk)(Special Report: Banking and Finance)
Law firm activity in downtown Los Angeles: 1996 year in review.
Park Avenue leads Midtown leasing.
Banking layoffs slow recovery of commercial property market.
Letter from Los Angeles.(solar energy and downtown regentrification)
LAUSD taking long view with Beaudry Building deal. (Real Estate Special Report -- L.A. Turns Inward).(Los Angeles Unified School District)(Brief...
Vacancy rates hold steady as building owners cut deals. (Real Estate Quarterly--Downtown).
BRIEFLY.(Business)(LOCAL)
$25m plan to create a new private school.(Claremont Preparatory School)(Brief Article)
BUSINESS BEAT.(Business)

Terms of use | Copyright © 2009 Farlex, Inc. | Feedback | For webmasters | Submit articles