Baker Awarded Contract to Perform Roadway Design Around New Pittsburgh Sports Facilities.Business Editors NOTE TO MEDIA: Photo is available in a Smart News Release(TM) on Business Wire's Home Page at www.businesswire.com PITTSBURGH--(BUSINESS WIRE)--March 22, 2000 Michael Baker Michael Baker can refer to:
See: American Stock Exchange :BKR BKR Baker BKR Birkirkara (postal locality, Malta) BKR Breaker BKR Broadcast Key Rotation BKR Best-Known Recipe ). The contract calls for Baker to design new roadways and upgrade existing roadways, on three sides of the new Steelers' Stadium as well as roadways on two sides of the Pirates' new PNC Park. In addition, West General Robinson Street will be extended through the site where Three Rivers Stadium • • [ currently stands. Baker's responsibilities include: street design, utility design, right-of-way procedures and design of a new pedestrian underpass at North Shore Drive from Riverfront Park to the new Steelers' Stadium. "This is an exciting time in Pittsburgh. The development of new stadiums is quickly changing the face of the North Side and helping lead a new wave of economic development in the city," John C. Hayward, executive vice president-transportation, said. "We are pleased to be assisting the Sports & Exhibition Authority with this design assignment which will improve the vitality of downtown Pittsburgh." Michael Baker Corporation (www.mbakercorp.com) provides engineering, management and operations services through its five business units: buildings, civil, energy, environmental, and transportation. Note: A Photo is available at URL URL in full Uniform Resource Locator Address of a resource on the Internet. The resource can be any type of file stored on a server, such as a Web page, a text file, a graphics file, or an application program. : http://www.businesswire.com/cgi-bin/photo.cgi?pw.032200/bb10 |
|
||||||||||||||

Printer friendly
Cite/link
Email
Feedback
Reader Opinion