Ashton Mining of Canada Inc.: Renard 9 Estimated at 2.4 Million Tonnes; Core Area Tonnage Increased to 22.4 Million Tonnes.VANCOUVER, British Columbia British Columbia, province (2001 pop. 3,907,738), 366,255 sq mi (948,600 sq km), including 6,976 sq mi (18,068 sq km) of water surface, W Canada. Geography -- Robert T. Boyd, President and CEO (1) (Chief Executive Officer) The highest individual in command of an organization. Typically the president of the company, the CEO reports to the Chairman of the Board. of Ashton Mining of Canada Inc. ("Ashton") (TSX TSX Toronto Stock Exchange (TSE before April, 2002) TSX Transfer from Stack Pointer to Index TSX True Space Extension :ACA ACA - Application Control Architecture ), is pleased to announce an initial tonnage TONNAGE, mar. law. The capacity of a ship or vessel. 2. The act of congress of March 2, 1799, s. 64, 1 Story's L. U. S. 630, directs that to ascertain the tonnage of any ship or vessel, the surveyor, &c. estimate of 2.4 million tonnes for the Renard 9 kimberlitic body. This estimate is based on data from drilling programs conducted by Ashton and its 50:50 joint venture partner, SOQUEM INC. ("SOQUEM"). These results bring the cumulative estimated tonnage for Renard 2, 3, 4, 65, and 9 to 22.4 million tonnes. These five bodies, together with Renard 8, are situated within the Core Area of the Renard cluster on the Foxtrot foxtrot one of the two artificial gaits of the five-gaited horse. A four-beat gait midway in speed between a walk and a trot. There is a great deal of similarity with several other gaits such as amble, fadge, slow pace, stepping pace, running walk, jog, hound jog. property in north-central Quebec. The 2005 winter drilling program in the Core Area was very successful and resulted in a 27 percent increase in tonnage over the initial estimates announced in February 2005. The additional tonnage is primarily due to increased tonnage for Renard 2 and 3 and to the 2.4 million tonnes of material now attributed to Renard 9.
Updated Summary of Estimated Tonnage and Diamond Results -
Renard Core Area
--------------------------------------------------------------------
Post-May 2004 Dense Media Separation
Results
------------------------------------
Estimated Weight
Tonnage of
Kimberlitic (million tonnes) Sample Estimated Diamond Content
Body (Note 1) (tonnes) of Sample (cpht) (Note 2)
--------------------------------------------------------------------
--------------------------------------------------------------------
Renard 2 4.2 173 92
--------------------------------------------------------------------
Renard 3 1.7 160 124
--------------------------------------------------------------------
Renard 4 6.1 171 40
--------------------------------------------------------------------
Renard 65 8.0 165 22
--------------------------------------------------------------------
Renard 9 2.4 6.04 92
--------------------------------------------------------------------
--------------------------------------------------------------------
Total 22.4
--------------------------------------------------------------------
Note 1- Wardrop Engineering Inc., a geological and engineering consulting firm Noun 1. consulting firm - a firm of experts providing professional advice to an organization for a fee consulting company business firm, firm, house - the members of a business organization that owns or operates one or more establishments; "he worked for a , prepared the tonnage estimates. Note 2 - The estimated diamond content, expressed in carats per hundred tonnes or "cpht" of diamondsgreater than 1.18 mm, may not be representative of the overall diamond content of the individual bodies due to a number of factors, including the location of the drill holes and the small size of the sample. A three dimensional visual representation of the tonnage defined to date in the Core Area can be viewed on Ashton's website at www.ashton.ca/investor_presentation_renardflythrough.html. Next Steps As reported on March 3, 2005, a 6.04 tonne tonne measure of weight or mass; 1 tonne=1000 kg. See also ton. sample collected from Renard 9 in 2004 returned 5.56 carats of diamonds including a stone weighing 3.26 carats, giving this sample an estimated diamond content of 92 carats per hundred tonnes. During the winter field season, an additional sample of approximately six tonnes of kimberlitic material was collected from Renard 9. This material will be processed by dense media separation at Ashton's North Vancouver North Vancouver, city (1991 pop. 38,436), SW British Columbia, Canada, on Burrard Inlet of the Strait of Georgia, opposite Vancouver, of which it is a suburb. Shipbuilding, woodworking, and the shipping of grain, lumber, and ore are the chief industries. laboratory and results are expected before the end of the second quarter. The joint venture believes that a strong potential exists to further increase the tonnage of Renard 9 and the other bodies in the Core Area through additional drilling. Further drilling in 2005 is therefore under consideration to identify kimberlitic material beyond the 22.4 million tonnes already estimated for the Core Area. This work is expected to result in the collection of a mini-bulk sample from Renard 8. Incremental Additional or increased growth, bulk, quantity, number, or value; enlarged. Incremental cost is additional or increased cost of an item or service apart from its actual cost. increases of tonnage estimates for the Core Area are likely to have a positive impact on the evaluation of the economic potential of the Renard cluster. Background Information Located approximately 50 metres south of Renard 4, Renard 9 has an interpreted near-surface horizontal width that varies from 25 to 60 metres with a strike length of 160 metres. One near-vertical and six inclined holes were drilled into the body during the winter field program. During the same program, two inclined holes drilled into Renard 4 were extended in the direction of Renard 9. In both cases, the drill passed through approximately 30 metres of country rock between the two bodies before intersecting in·ter·sect v. in·ter·sect·ed, in·ter·sect·ing, in·ter·sects v.tr. 1. To cut across or through: The path intersects the park. 2. , respectively, 80 and 120 metres of kimberlitic material within Renard 9. The tonnage estimate for Renard 2, 3, 4, 65 and 9 does not constitute a mineral resource. Instead, this calculation is simply an order-of-magnitude estimate of the potential tonnage of the four bodies. The tonnage was calculated by multiplying mul·ti·ply 1 v. mul·ti·plied, mul·ti·ply·ing, mul·ti·plies v.tr. 1. To increase the amount, number, or degree of. 2. Mathematics To perform multiplication on. the respective interpreted volumes for each body, as determined in a three-dimensional wire frame model, by a specific gravity specific gravity, ratio of the weight of a given volume of a substance to the weight of an equal volume of some reference substance, or, equivalently, the ratio of the masses of equal volumes of the two substances. of 2.6 grams per cubic centimetre. The specific gravity of 2.6 is the average value determined to date for kimberlitic material collected from the Renard bodies. The model assumes an area of influence of five to ten metres around the actual drill hole intersection intersection /in·ter·sec·tion/ (-sek´shun) a site at which one structure crosses another. intersection a site at which one structure crosses another. . In some cases, only limited drill data are available. There exists potential to revise the current tonnage estimates through additional drilling. Ashton Mining of Canada Inc. and SOQUEM INC. Ashton's prime objective is the discovery or acquisition of diamond prospects capable of rapid advancement to development and production. The Corporation is recognized as one of the leading explorers in the Canadian diamond industry. Ashton's competitive advantages include the significant exploration experience of its key personnel as well as its extensive in-house laboratory facilities in North Vancouver, dedicated exclusively to the Corporation's exploration projects. SOQUEM is a wholly owned subsidiary Wholly Owned Subsidiary A subsidiary whose parent company owns 100% of its common stock. Notes: In other words, the parent company owns the company outright and there are no minority owners. of SGF SGF Svenska Golfförbundet (Swedish Golf Federation) SGF Société Générale de Financement (Quebec, Canada) SGF Smart Game Format SGF Simulated Gastric Fluid Mineral inc., a subsidiary of the Societe generale de financement du Quebec ("SGF"). The mission of the SGF, an industrial and financial holding company, is to undertake economic development projects in the industrial sector in cooperation with partners and in compliance with the economic development policies of the Government of Quebec. Ashton is the operator of the joint venture's exploration programs. Brooke Clements, Professional Geologist and Ashton's Vice President, Exploration is responsible for their design and conduct, and for the verification and quality assurance of analytical analytical, analytic pertaining to or emanating from analysis. analytical control control of confounding by analysis of the results of a trial or test. results. Ashton Mining of Canada Inc. (TSX:ACA) |
|
||||||||||||||||

Printer friendly
Cite/link
Email
Feedback
Reader Opinion