Printer Friendly
The Free Library
14,529,347 articles and books
Member login
User name  
Password 
 
Join us Forgot password?

Argosy Mining Further Kremnica Drilling Results.


VANCOUVER, British Columbia--(BUSINESS WIRE)--Nov. 25, 1996-- Argosy Mining Corp. (VSE See DOS/VSE.

VSE - Virtual Storage Extended
:AGO) Argosy is pleased to announce its new diamond drilling Diamond Drilling is a highly specialized industry used for mineral exploration around the world. Most commonly using wireline and core bits with diamond encrusted matrix. To drill holes to max depths of twelve thousand feet, for the recovery of core used in verifying mineral  results at the Kremnica project, located in the central Slovak Republic, Europe. Drilling commenced in June and is planned to continue into December.

At Kremnica, Argosy has received substantially all of the assay results from its 29 hole, 3634 metre metre

In poetry, the rhythmic pattern of a poetic line. Various principles have been devised to organize poetic lines into rhythmic units. Quantitative verse, the metre of Classical Greek and Latin poetry, measures the length of time required to pronounce syllables,
 Phase I diamond drilling program. Results were released previously for twelve complete and six partial holes. The significant drill intercepts in all drill holes are listed in the attached table. The drill intercepts that are either new or that have been extended by the latest assays are indicated below. The new assay data demonstrates that Argosy is continuing to confirm and extend the Sturec gold deposit. -0-

Drill Hole    From    To     Length     Gold     Silver
              (m)     (m)     (m)       (g/t)    (g/t)

AS-1          87.4    95.3    7.9       1.88      9.2

AS-2          79.1    80.2    1.1      15.30      7.1
             111.6   117.5    5.9       2.72     20.2

AS-3.1B       55.2    64.0    8.8       1.64      5.8

AS-4           1.5    43.0   41.5       1.53     14.3

AS-4D          8.2    10.8    2.6       6.83     27.5
              14.0    54.0   40.0       1.88     18.1
              57.0    93.0   36.0       1.67     13.6
              99.0   116.0   17.0       1.04     27.0

AS-4.5.1A      2.0    23.6   21.6       1.56     10.2

AS-4.5.1B      4.7    46.0   41.3       1.05      9.5

AS-5.1.1A      1.5    56.0   54.5       4.24     36.2

AS-5.1.1B      2.0    22.0   20.0       1.21     10.6

AS-6         114.2   129.0   14.8       1.35     23.7
             145.0   171.0   26.0       2.48     54.2

AS-7         121.3   182.0   60.7       4.84     41.9




Argosy has an on-going check assay program that has modestly affected some of the previously reported assay intervals. The company's current practice is to release assays as they are obtained and to change them as necessary as check assays are received.

Drill hole AS- as-
pref.
Variant of ad-.
7 provides the most significant drill intercept intercept

in mathematical terms the points at which a curve cuts the two axes of a graph.
 at Kremnica to date. Assays returned from the bottom 22 metres of core extend the intercept to 60.7 metres and increase the average grade to 4.84 g/t gold plus 41.9 g/t silver (previously reported to be 38.7 metres at 3.95 g/t gold). The best interval in the hole is a 24 metre long intercept that averages 9.3 g/t gold. The drill hole was terminated in ore grade Ore grade is a measure that describes the concentration of a valuable natural material (such as metals or minerals) in its surrounding ore. Ore grade is used to assess the economic feasibility of a mining operation: the cost of extracting a natural material from its ore is directly  mineralization Mineralization
The process by which the body uses minerals to build bone structure.

Mentioned in: Rickets

mineralization,
n the bioprecipitation of an inorganic substance.
 due to drilling difficulties.

Mr. Steven Potter A potter is someone who makes pottery.

Potter may also refer to: People
  • Potter, Alonzo, Bishop of Pennsylvania
  • Potter, Barnaby (1577–1642), Bishop of Carlisle
  • Potter, Beatrix (1866–1943), British children's writer
 reports, "Hole AS-7 demonstrates that a wide zone of higher-grade gold mineralization extends 50 metres below previous data and remains open to depth. This excellent drill hole intercept indicates an attractive drill target exists to develop an underground resource below an initial open pit."

Nine of the drill holes ended in mineralization due to drilling difficulties associated with unstable unstable,
adj 1. not firm or fixed in one place; likely to move.
2. capable of undergoing spontaneous change. A nuclide in an unstable state is called
radioactive. An atom in an unstable state is called
excited.
 old mine workings. The 9 drill hole intercepts follow: -0-

Drill Hole    From    To     Length     Gold     Silver
              (m)     (m)     (m)       (g/t)    (g/t)

AS-4           1.5    43.0   41.5       1.53     14.3
              99.0   116.0   17.0       1.04     27.0

AS-4.1A       18.6    68.0   49.4       2.61     20.3

AS4.1B        17.0    86.0   69.0       1.66     12.1

AS-4.5.1B      4.7    46.0   41.3       1.05      9.5

AS-5.1.1A      1.5    56.0   54.5       4.24     36.2

AS-5.1.1B      2.0    22.0   20.0       1.21     10.6

AS-7         121.3   182.0   60.7       4.84     41.9




Argosy's drilling to date indicates the Sturec deposit strikes north and dips to the east at 60 to 80 degrees. Over an 800 metre strike length, its thickness ranges from about 10 metres to more than 100 metres. The thicker part of the deposit is interpreted to occur along a structural intersection intersection /in·ter·sec·tion/ (-sek´shun) a site at which one structure crosses another.

intersection

a site at which one structure crosses another.
 which extends beyond the area which has been drilled.

Argosy's Phase II Kremnica drilling is underway. The program is testing the Sturec vein system over a 600 metre long zone, south of the Phase I drilling and the untested Katarina target located to the west of Sturec. This winter, the company will initiate metallurgical met·al·lur·gy  
n.
1. The science that deals with procedures used in extracting metals from their ores, purifying and alloying metals, and creating useful objects from metals.

2.
 studies and resource calculations for the Sturec deposit and analyze historic mine data to generate additional exploration targets. The company also plans to install a sample preparation facility at Kremnica to reduce the time required between drilling and the receipt of assays. An aggressive drilling campaign is planned for 1997.

ON BEHALF OF THE BOARD signed by "Y.R. Simpson Simp·son , Sir James Young 1811-1870.

British obstetrician and a founder of gynecology. He is also known for introducing the use of chloroform as an anesthetic.
" YALE R. SIMPSON, President

NOTE: For complete table of drill results please contact the company.

The Vancouver Stock Exchange Vancouver Stock Exchange (VSE)

A securities and options exchange in Vancouver, British Columbia, (Canada), specializing in venture capital companies.


Vancouver Stock Exchange

See Canadian Venture Exchange (CDNX).
 has neither approved nor disapproved the contents of this news release.

CONTACT: Argosy Mining Corp.

Yale R. Simpson, 604/689-5529

604/689-5079 (fax)

800/851-7423
COPYRIGHT 1996 Business Wire
No portion of this article can be reproduced without the express written permission from the copyright holder.
Copyright 1996, Gale Group. All rights reserved. Gale Group is a Thomson Corporation Company.

 Reader Opinion

Title:

Comment:



 

Article Details
Printer friendly Cite/link Email Feedback
Publication:Business Wire
Date:Nov 25, 1996
Words:846
Previous Article:Applied Materials Announces Major Breakthrough in HDP-CVD with Second-Generation System; Ultima HDP-CBD Centura Leads the Industry with First...
Next Article:IPL Energy Inc. Share Price is Fair and Reasonable.
Topics:



Related Articles
Phase II drilling intercepts high grade gold at Lo Increible Property, Venezuela.
Argosy Mining - Austrian Gold Properties Acquired.
ARGOSY MINING CORP. - AUSTRIAN DRILLING PROGRAM.
Argosy Mining makes announcement; Major Gold Acquisitions.
Argosy awards 10,000 metre drilling contract to expand gold reserves at Kremnica, Slovak Republic.
Argosy Mining Pukanec Project Update.
Argosy Mining Kremnica Gold Project Third New Zone Discovered.
Argosy Acquires Major Nickel Laterite Project.
Argosy and Calliope Announce Merger.
Argosy Mining Announces Musongati Mining Convention Ratified by Government.

Terms of use | Copyright © 2009 Farlex, Inc. | Feedback | For webmasters | Submit articles