Aquifer test modeling.1420042920 Aquifer test An aquifer test (or a pumping test) is conducted to evaluate an aquifer by "stimulating" the aquifer through constant pumping, and observing the aquifer's "response" (drawdown) in observation wells. modeling. Walton, William William, crown prince of Germany William or Frederick William, 1882–1951, crown prince of Germany, son of William II. In World War I he commanded (1914) an army on the Western Front and was nominal commander in the German attack C. CRC (Cyclical Redundancy Checking) An error checking technique used to ensure the accuracy of transmitting digital data. The transmitted messages are divided into predetermined lengths which, used as dividends, are divided by a fixed divisor. / Taylor Taylor, city (1990 pop. 70,811), Wayne co., SE Mich., a suburb of Detroit adjacent to Dearborn; founded 1847 as a township, inc. as a city 1968. A small rural village until World War II, it developed significantly in the second half of the 20th cent. & Francis 2007 222 pages $129.95 Hardcover GB1199 A hydraulic engineer who has been active in groundwater aquifer testing since 1949, Walton here explains how to construct a space and time representation of the groundwater flow system within an aquifer test domain that captures the essence of the groundwater system. He considers modeling equations and software selection, data adjustment, data analysis, and model evaluation. A large number of sample data file sets is included. ([c]20072005 Book News, Inc., Portland, OR) |
|
||||||||||||||

Printer friendly
Cite/link
Email
Feedback
Reader Opinion