Applying lean principles to customer satisfaction measurement: a new system weighs the impact of proposed changes.


A basic premise in Lean manufacturing Lean manufacturing is the production of goods using less of everything compared to mass production: less human effort, less manufacturing space, less investment in tools, and less engineering time to develop a new product.  principles is the elimination of non-value added activity by minimizing variation. However, standardizing systems while accommodating the needs of 30 or more customers can be a significant challenge for EMS providers. Customer satisfaction measurement is one area where standardization standardization

In industry, the development and application of standards that make it possible to manufacture a large volume of interchangeable parts. Standardization may focus on engineering standards, such as properties of materials, fits and tolerances, and drafting
 can improve efficiency. Yet, the more standardized standardized

pertaining to data that have been submitted to standardization procedures.


standardized morbidity rate
see morbidity rate.

standardized mortality rate
see mortality rate.
 the format, the less meaningful it may be at the customer level.

Like many contract manufacturers, Epic ran a dual customer satisfaction system. Epic participated in its customers' ratings systems and conducted monthly and annual web-based customer satisfaction surveys. However, only 8% of customers were sending formal monthly scorecards defining their expectations. Of the remaining customers, only 20% were filling out monthly surveys, and the surveys tended to generate subjective responses that did not necessarily tie to specific improvement activities or clearly defined goals.

In the fourth quarter 2007, the company's management team decided to put a new system in place that would:

* Work seamlessly across multiple facilities.

* Better align align (līn),
v to move the teeth into their proper positions to conform to the line of occlusion.
 with each customers' measurement criteria (expectations of Epic performance).

* Deliver quantitative feedback, even on softer areas of evaluation such as quality of team interaction.

* Ensure that both Epic's customer focus teams (CFT CFT complement fixation test; see under fixation.

CFT

complement fixation test.
) and operational management had continuous visibility into customer issues and status of corrective actions A corrective action is a change implemented to address a weakness identified in a management system. Normally corrective actions are instigated in response to a customer complaint, abnormal levels if internal nonconformity, nonconformities identified during an internal audit or .

* Integrate with long-term objectives for account growth. The new system was fully implemented in 2008, then reevaluated and fine-tuned last March.

System overview. We manage projects using a Customer Focus Team model. Each CFT includes a program manager, account manager, quality engineer, product engineer, test engineer, material analyst and inside salesperson.

Early in our operational strategy formulation formulation /for·mu·la·tion/ (for?mu-la´shun) the act or product of formulating.

American Law Institute Formulation
, management developed a methodology for measuring and sharing performance information, known as the Plant Operational Review (POR POR problem-oriented record.

POR
abbr.
problem-oriented record



POR

Problem-Oriented Record.
) system. The original version monitored approximately 60 metrics metrics Managed care A popular term for standards by which the quality of a product, service, or outcome of a particular form of Pt management is evaluated. See TQM.  company-wide down to the floor level. These metrics were formally reviewed on a daily/weekly basis by project personnel, monthly by plant managers, and quarterly by senior management. Over time, the system has evolved to include the original metrics list, external benchmarks and longer-term performance trends. The POR process starts with a summary of overall company financial performance metrics Performance metrics are measures of an organizations activities and performance. Performance metrics should support a range of stakeholder needs from customers, shareholders to employees [1]. , then focuses on specific productivity and operational performance in human resources The fancy word for "people." The human resources department within an organization, years ago known as the "personnel department," manages the administrative aspects of the employees. , quality, manufacturing, engineering, sales, purchasing and finance. The functional managers responsible for performance to measured metrics are also responsible for defining the external benchmarks relevant to their areas.

During the gap analysis of the former Customer Survey System, opportunities for improvement were identified that could tie into the management review cycle (POR) to close our internal loop. One such opportunity was to create a working tool for use by the CFT and customer that would define expectations based on the monthly survey. The redesigned customer satisfaction measurement tool was named the Customer Expectation Worksheet. A goal for the new system was that it link to POR, showing both customer issues and the status of corrective actions related to those issues. Another goal was to link the customer satisfaction survey closely with other program management tools. One key tool that was developed was the CFT Tracker.

The CFT Tracker is a living diary of each customer. It is an Excel A full-featured spreadsheet for Windows and the Macintosh from Microsoft. It can link many spreadsheets for consolidation and provides a wide variety of business graphics and charts for creating presentation materials.  workbook work·book  
n.
1. A booklet containing problems and exercises that a student may work directly on the pages.

2. A manual containing operating instructions, as for an appliance or machine.

3.
 resident on the company's intranet that includes tabs for core customer team contact list, product/part number lists, NPI NPI National Provider Identifier, see there  planning, meeting agenda, CFT open action items, continuous improvement team (CIT n. 1. A citizen; an inhabitant of a city; a pert townsman; - used contemptuously.
Which past endurance sting the tender cit.
- Emerson.
) tracker, CFT Paynter chart, customer PPM tracking, scrap analysis, closed CFT action list and the Customer Expectation Worksheet. In short, the CFT provides the entire account history and current status information at the fingertips "Fingertips" is a 1963 number-one hit single recorded live by "Little" Stevie Wonder for Motown's Tamla label. Wonder's first hit single, "Fingertips" was the first live, non-studio recording to reach number-one on the Billboard Pop Singles chart in the United States.  of anyone within the organization.

Because the CFT Tracker stores trends information related to quality and continuous improvement initiatives, it enables real-time analysis of customer issues identified through the Customer Expectation Survey and makes it easy for the CFT to respond with specific data related to issues identified by the customer.

For example, if our team has made DfM recommendations that are currently affecting manufacturing, on-time delivery, quality, etc., then this will be tracked in the CFT Tracker through the Paynter charts, If the customer has opted not to adopt the recommendations, but indicates in its monthly survey that detects exceed predefined limits, the CFT can look at the CIT tracker, PPM data and CFT Paynter to determine what percentage of defects relate to the unadopted unadopted
Adjective

Brit (of a road) not maintained by a local authority
 DfM recommendation. With the Paynter chart, the team can show a weighted analysis of the impact of adopting the proposed changes. Similarly, if the detects relate to an out-of-control process, we would have the data to drive internal improvements. The result: a hyper-focused corrective action tool. Training was conducted at all Epic facilities. In Mexico, training was conducted in Spanish to ensure full understanding among all CFT members.

The survey process. The Customer Expectation Worksheet was designed as a relatively simple tool. We have defined a series of ratings tied to quality, delivery performance and partnership. Each of the three sections has three-to-four defined performance indicators. Within each performance indicator, respondents In the context of marketing research, a representative sample drawn from a larger population of people from whom information is collected and used to develop or confirm marketing strategy.  rate on a 1 to 5 scale:

* 5--Frequently exceeds requirements (green color code Noun 1. color code - system using colors to designate classifications
code - a coding system used for transmitting messages requiring brevity or secrecy
).

* 4--Occasionally exceeds requirements (green).

* 3--Meets requirements (yellow).

* 2--Occasionally does not meet requirements (red).

* 1--Frequently does not meet requirements (red).

The CFTs work with their customer to establish a customer-specific metric for each of these defined performance indicators. Customers then rate on the 1 to 5 scale against their predefined performance metrics. Although a rating of 3 indicates requirements are met, it is coded yellow and reported as an opportunity for improvement. Ratings of 1 or 2 are coded red and generate a corrective action requirement, which is tracked at both the CFT and POR level.

Each CFT provides a list of key contacts that Epic interacts with on a day-to-day basis. The survey is sent as a web-based choice board form to customer contacts. Requests are rotated rotated

turned around; pivoted.


rotated tibia
see rotated tibia.
 among the total list of core contacts so that each contact only gets a request a couple times a year. If there is no response to the initial survey request, up to two reminders are sent out. If the customer contact still doesn't return a survey, the CFT will touch base to determine the reason why.

Also, a more detailed annual Customer Loyalty Survey conducted via email measures:

* Overall performance satisfaction compared to satisfaction with other EMS providers.

* Perception of management and key support competencies.

* Relationship with project team.

* Responsiveness to problems.

* Perception of price competitiveness.

* Plans for future business allocation The apportionment or designation of an item for a specific purpose or to a particular place.

In the law of trusts, the allocation of cash dividends earned by a stock that makes up the principal of a trust for a beneficiary usually means that the dividends will be treated as
.

This annual survey is sent to multiple contacts at each customer and includes areas for detailed comments and suggestions for improvement. Survey data are reviewed at the plant and corporate level

Results and lessons learned. When the new survey was deployed in 2008, it consistently generated a 45 to 50% response rate, compared to the prior 20% response rate. In 2009, that has dropped to about 30%, but that percentage typically includes 100% of our largest customers. In determining survey improvements for 2009, one issue has stood out. Customer project teams prefer to do the survey as a group. When individuals are contacted for a survey, they often solicit feedback from other members of the core customer team. If they do not get feedback, they often do not return the form. As a result, a 2009 change to the survey method will be to offer the customer the opportunity to complete surveys from each core customer group, rather than to attempt to rotate between those team members.

An additional indicator of the robustness of the process is that we won all five individual service category awards in our revenue size class in CIRCUITS Assembly's 2009 Service Excellence Awards for EMS providers.

Tony Bellitto is quality manager-US Operations at Epic Technologies (Epictech.com); tony.bellitto@Epictech.com.

[ILLUSTRATION OMITTED]
COPYRIGHT 2009 UP Media Group, Inc.
No portion of this article can be reproduced without the express written permission from the copyright holder.
Copyright 2009 Gale, Cengage Learning. All rights reserved.

 Reader Opinion

Title:

Comment:



 

Article Details
Printer friendly Cite/link Email Feedback
Title Annotation:Getting Lean
Comment:Applying lean principles to customer satisfaction measurement: a new system weighs the impact of proposed changes.(Getting Lean)
Author:Bellitto, Tony
Publication:Circuits Assembly
Date:Aug 1, 2009
Words:1280
Previous Article:Dewetting or non-wetting causes: when the solder doesn't stick, first check the pad.
Next Article:PWB delamination and measling: a thinly plated hole could be susceptible to PTH lead damage.
Topics:



Related Articles
Lean object-oriented software development.
PIMA/CPBIS announce Spring 2006 Webcast series.
Lean Six Sigma: saving money and jobs.
Avoiding culture shock after acquisition: one EMS provider shares its integration experience.
Successful lean implementations--and why some fail.
A journey of improvement; in association with Mouchel.
Lean Thinking: Banish Waste and Create Wealth in Your Corporation.
Applying LEAN management to automation.
World Class Manufacturing Benchmarks
The Launch of AS9100 Rev C Will Make Firms More Competitive the Aerospace, Aviation and Defense Business Sectors Are Poised

Terms of use | Copyright © 2012 Farlex, Inc. | Feedback | For webmasters | Submit articles