Printer Friendly
The Free Library
14,709,857 articles and books
Member login
User name  
Password 
 
Join us Forgot password?

Algeria - Gas Field: Rhourde Nouss.


The second largest gas producer located south of Hassi Messaoud Hassi Messaoud (häs`sē mĕs'säd`) [Arab.,=blessed well], town, E Algeria. , the Rhourde Nouss region is officially estimated to have 370 BCM BCM Baylor College of Medicine
BCM Become
BCM Business Communications Manager (Nortel)
BCM Broadcom Corporation
BCM Business Continuity Management
BCM Business Contact Manager (Microsoft) 
 of proven gas reserves and over 1 BCM of probable reserves. The area consists of five fields: Rhourde Nouss (the first discovery in 1980), Rhourde Nouss Sud-Est, Rhourde Adra, Rhourde Chouff and Rhourde Hamra. The gas is in a Triassic formation at a depth of 9,850 feet. Around the fields are oil producing structures. Rhourde Chouff and Rhourde Hamra were developed in the late 1980s and brought on stream in 1992. The older fields were developed further by an Italian group led by Snamprogetti and completed in 1987. New facilities include a gas gathering and distribution grid of about 350 km, four degasolining units to process 41 MCM/day of gas from the Rhourde Nouss and Rhourde Adra fields and a 39 MCM/day reinjection station. To fulfill its export obligation to Spain, Sonatrach in mid-1996 contracted SNC SNC St Norbert College (De Pere, Wisconsin)
SNC Sistema Nervioso Central
SNC Société en Nom Collectif (French: Partnership)
SNC Système Nerveux Central (French: central nervous system) 
 Lavalin of Canada for a $345m project to raise production at the Rhourde Nouss system by 270 MCF/day. On Feb. 6, 1998, Lavalin got an addendum, worth $120m, to upgrade existing facilities and boost production further. Work was to include a new gas slug catcher, modifications to the dehydration system of the existing condensate condensate, matter in the form of a gas of atoms, molecules, or elementary particles that have been so chilled that their motion is virtually halted and as a consequence they lose their separate identities and merge into a single entity.  extraction lines and minor changes to other installations. Lavalin was to carry out the engineering, procurement and construction The introduction to this article is vague. To comply with Wikipedia's guidelines, it should be improved. .
COPYRIGHT 1999 Input Solutions
No portion of this article can be reproduced without the express written permission from the copyright holder.
Copyright 1999, Gale Group. All rights reserved. Gale Group is a Thomson Corporation Company.

 Reader Opinion

Title:

Comment:



 

Article Details
Printer friendly Cite/link Email Feedback
Publication:APS Review Gas Market Trends
Geographic Code:6ALGE
Date:Feb 8, 1999
Words:233
Previous Article:Algeria - Gas Field: Hassi R'Mel.
Next Article:Algeria - Gas Field: Alrar.
Topics:



Related Articles
Algeria Foreign Operators Coming Onstream: Cepsa - Rhourde El Krouf.
Algeria - Total Operations - Oil & Wet Gas Fields.
Algeria - Other Foreign Operators.
Algeria - The Sonatrach Oilfields & The Legal Framework.
Algeria - Pipelines.
Algeria - Oil Producting Fields - Profiles.
ALGERIA - Oilfield Profiles - Cepsa - Rhourde El Krouf.
ALGERIA - Oilfield Profiles - TotalFinaElf Operations - Oil & Wet Gas Fields.
ALGERIA - Oil & Gas Fields & Foreign Operators.
ALGERIA - Gas Fields.

Terms of use | Copyright © 2009 Farlex, Inc. | Feedback | For webmasters | Submit articles