Alexis Minerals Corporation: Lac Herbin Interim Results Return 25.88 Grams Gold Over 7.0 Metres-Second Diamond Drill Mobilized.TORONTO -- Alexis Minerals Corporation (TSX TSX Toronto Stock Exchange (TSE before April, 2002) TSX Transfer from Stack Pointer to Index TSX True Space Extension VENTURE:AMC (Advanced Mezzanine Card) See AdvancedTCA. )is pleased to announce very positive interim results from underground diamond drilling Diamond Drilling is a highly specialized industry used for mineral exploration around the world. Most commonly using wireline and core bits with diamond encrusted matrix. To drill holes to max depths of twelve thousand feet, for the recovery of core used in verifying mineral of the S1 East Zone on the company's Lac Herbin project. Results cover an initial 1,046 metres of a planned, 8,000-metre underground drill program designed to test three of five known gold zones during Phase 1. Underground development continues to advance towards the HW and Lac Herbin Zones with 1140 metres of Ramp development completed to date. Drill bays have now been developed on the HW Zone and a second drill machine is being mobilized. Development towards the Lac Herbin Zone continues at the 165-metre vertical-elevation. The project is located 10 km northeast of Val-d'Or, adjacent to the past-producing Ferderber (1.6 million tonnes (Mt) grading 6.99 grams gold per tonne (g Au/t)) and Dumont Mines (1.2 Mt grading 6.51 g Au/t). Results of the initial drilling on the S1 zone are presented in Table 1. Highlights include: S1 Zone - steeply dipping Quartz-Tourmaline-Pyrite Vein within the S1 shear - 25.86 g Au/t (10.28 g Au/t cut(i)) over 7.0 m (hole LH01-013) - including 107.0 g Au/t over 1.5 m - 20.68 g Au/t (12.9 g Au/t cut(i)) over 1.6 m (hole LH01-012) - including 51.1 g Au/t over 0.6 m - 8.14 g Au/t over 2.7 m (hole LH01-010) - including 16.3 g Au/t over 1.3 m - 6.92 g Au/t over 1.5 m (hole LH01-014) - including 23.9 g Au/t over 0.5 m The West E zone remains open to the west and at depth and additional drilling is planned. West E Shear- moderately dipping Quartz-Tourmaline-Pyrite Vein within the (conjugate conjugate /con·ju·gate/ (kon´jdbobr-gat) 1. paired, or equally coupled; working in unison. 2. a conjugate diameter of the pelvic inlet; used alone usually to denote the true conjugate diameter; see ) West E shear shear: see strength of materials. Shear A straining action wherein applied forces produce a sliding or skewing type of deformation. and adjacent to the S1 East shear: - 8.67 g Au/t (5.3 g Au/t cut(i)) over 7.7 m (hole LH01-016) including, - 63.2 g Au/t over 0.9m "Exploration has confirmed good structural continuity and higher than anticipated gold grades in the S1 East zone," said David Rigg, President and CEO (1) (Chief Executive Officer) The highest individual in command of an organization. Typically the president of the company, the CEO reports to the Chairman of the Board. of Alexis minerals. "The detailed understanding of structural controls on mineralization Mineralization The process by which the body uses minerals to build bone structure. Mentioned in: Rickets mineralization, n the bioprecipitation of an inorganic substance. will add considerably to our ability to define the current Resource and expand upon the Resource as the program continues. Potential remains to expand the S1 East zone to the west and to depth, outside the previous limits of inferred resource blocks identified from surface drilling."
Table 1 - Lac Herbin Underground Drilling Results (results projected
over a minimum true mining width of 1.5 m; LV equals Low Values)
--------------------------------------------------------------------
Hole Number To-From Length Zone Uncut Cut True
(m) (m) Grades Grades Width
(g Au/t) (g Au/t) (m)
--------------------------------------------------------------------
LH01-001 40.5 - 42.0 1.5 S1 3.05 1.5
--------------------------------------------------------------------
LH01-002 41.5 - 43.0 1.5 S1 1.19 1.5
--------------------------------------------------------------------
LH01-003 40.5 - 44.2 3.7 S1 QT Vein - LV 3.2
--------------------------------------------------------------------
LH01-004 38.8 - 40.4 1.6 S1 QT Vein - LV 1.5
--------------------------------------------------------------------
LH01-006 61.0 - 63.6 2.6 S1 Shearing - LV 2.0
--------------------------------------------------------------------
LH01-007 102.3 - 105.9 3.6 S1 Shearing - LV 1.9
--------------------------------------------------------------------
LH01-009 28.5 - 31.5 3.0 S1 Shearing - LV 1.5
--------------------------------------------------------------------
LH01-010 37.0 - 39.7 2.7 S1 8.14 2.5
--------------------------------------------------------------------
LH01-011 31.5 - 33.8 2.3 S1 2.97 2.3
--------------------------------------------------------------------
LH01-012 34.7 - 36.3 1.6 S1 20.68 12.88 1.5
--------------------------------------------------------------------
LH01-013 39.7 - 46.7 7.0 S1 25.86 10.28 5.5
--------------------------------------------------------------------
LH01-014 33.0 - 34.9 1.9 S1 6.92 1.5
--------------------------------------------------------------------
LH01-015 35.7 - 37.6 1.9 S1 1.77 1.5
--------------------------------------------------------------------
LH01-016 46.6 - 50.0 3.4 S1 1.64 1.5
--------------------------------------------------------------------
63.3 - 71.0 7.7 West E 8.67 5.29 1.6
--------------------------------------------------------------------
(i)Cut Grade- all assay in excess of 34.28 g Au/t are cut conservatively to 34.28 g Au/t (or 1.0 troy ounce/tonne), a common industry practice. Historical practice at Dumont and Ferdeber operations mining similar mineralization employed cutting factors of 68.56 g Au/t and 51.42 g Au/t, respectively, based on 15 years of production. Cutting factors at Lac Herbin will be established based on statistical results of the current program and bulk sampling. Drilling has defined the apparent eastern limit of mineralization in the S1 East zone (see Figure 1). Several holes have intersected significant quartz-tourmaline veins in the S1 structure with no pyrite pyrite (pī`rīt) or iron pyrites (pīrī`tēz, pə–, pī`rīts), pale brass-yellow mineral, the bisulfide of iron, FeS2. and subsequently only low gold grades (QT Vein - LV, Table 1). Pyrite is intimately associated with gold. The local distribution of pyrite adjacent to the QT Vein-LV will ultimately define ore zone limits. Final stope stope n. An excavation in the form of steps made by the mining of ore from steeply inclined or vertical veins. tr.v. stoped, stop·ing, stopes To remove (ore) from or mine by means of a stope. limits at the adjacent Dumont and Ferdeber Mines were generally based on this distribution and were defined during drifting and stope development. Mineralization at Lac Herbin can be expected to show similar behavior. To view Figure 1, Lac Herbin section 1 East, please click on the link below: http://www.ccnmatthews.com/docs/herbina.pdf The ramp crosses the point of intersection of the S1 East and West E zones on section 217150E, in the area of the intersection in hole LH01-016, immediately west of the drilling reported in Table 1. The quartz veining vein·ing n. Distribution or arrangement of veins or veinlike markings. in the S1 and West E shear zones at this location shows good lateral continuity over strike lengths of more than 20 metres and the western end of the development remains in well mineralized min·er·al·ize v. min·er·al·ized, min·er·al·iz·ing, min·er·al·iz·es v.tr. 1. To convert to a mineral substance; petrify. 2. To transform a metal into a mineral by oxidation. 3. veining. Chip and muck sample grades obtained from the zones correspond well with diamond drillhole grades. The drift and ramp intersection was unexpected and confirms the westward continuation of the zone. Additional drilling will be undertaken to expand the zone and trace its westward continuation. "The resource blocks which defined the original S1 East Zone were based on three widely spaced surface drill holes which returned an average weighted grade of 4.53 g Au/t. The detailed drilling has identified higher grades which will significantly affect the average grade of this lens once definition drilling is completed." said Richard Roy
Richard Roy is a director, actor and screenwriter. Filmography Director
The current Phase I underground program includes 1,250 metres of ramp excavation excavation In archaeology, the exposure, recording, and recovery of buried material remains. The techniques employed vary by the type of site, but all forms of archaeological excavation require great skill and careful preparation. , development of the 165 Level (165 metres below surface) and the completion of 8,000 m of delineation drilling from underground drill stations. Delineation drilling will be completed on the S1 East Zone (4.53 g Au/t) and advance across the Hanging Wall and Lac Herbin zones (10.31 g Au/t and 7.81 g Au/t, respectively) during March and April, 2006. Phase 2 of the underground program will further explore the gold potential of the area including delineation of the high grade S1 Deep Zone and the S3 Zone. Phase 3 will include bulk sampling of mineralization. The project area lies 1.8 km from the fully-permitted, 1400 TPD TPD Tons Per Day TPD Therapeutic Products Directorate TPD Total and Permanent Disablement (insurance) TPD Temperature Programmed Desorption TPD Temporary Partial Disability (insurance) Aurbel Gold Mill which is held on "care and maintenance". Quality Control The Lac Herbin underground exploration program is supervised by Mr. Richard Roy, P.Geo., of NordQuest Inc., and Daniel St. Arnaud, P.Eng., Qualified Persons as defined under NI 43-101 guidelines guidelines, n.pl a set of standards, criteria, or specifications to be used or followed in the performance of certain tasks. . Assay samples are taken from underground drill core sawed in half with one half sent to a commercial laboratory and other half retained for future reference. A strict QA/QC QA/QC Quality Assurance/Quality Control program is followed which includes mineralized standards, blank and field duplicate for each batch of samples. Assays were performed by ALS Als (äls), Ger. Alsen, island, 121 sq mi (313 sq km), Sønderjylland co., S Denmark, in the Lille Bælt, separated from the mainland by the narrow Alensund. Chemex - Chimitec of Val-d'Or (Quebec). Alexis Minerals Corporation is a Canadian exploration and development company listed on the TSX Venture Exchange TSX Venture Exchange Originally called the Canadian Venture Exchange (CDNX), this was a result of the merger of the Vancouver and Alberta stock exchanges. The goal of TSX Venture Exchange is to provide venture companies with effective access to capital while protecting investors. . Alexis holds a portfolio of properties covering approximately 212 square kilometers in the Val d'Or Val d'Or (väl dôr), town (1991 pop. 23,842), SW Que., Canada, SE of Rouyn-Noranda. It is a mining center. Gold was discovered in the region in 1909; copper, zinc, lead, and molybdenum are also mined. area and considered highly prospective for both gold and base metals. Alexis has a clear route to 100% ownership in the properties and maintains an option to purchase the 1400 tonne per day Aurbel gold mill. The Company has also entered into option agreement with Falconbridge Limited (formerly Noranda Inc.) wherein where·in adv. In what way; how: Wherein have we sinned? conj. 1. In which location; where: the country wherein those people live. 2. Alexis will earn a 50% interest in all of Falconbridge's properties in the prospective Rouyn-Noranda base metal and gold camp, Quebec. The Falconbridge properties cover approximately 825 square kilometres Square kilometre (U.S. spelling: square kilometer), symbol km², is a decimal multiple of the SI unit of surface area, the square metre, one of the SI derived units. 1 km² is equal to:
Statements in this release that are not historical facts are "forward-looking statements forward-looking statement A projected financial statement based on management expectations. A forward-looking statement involves risks with regard to the accuracy of assumptions underlying the projections. " within the meaning of the U.S. Private Securities Litigation Reform Act The Private Securities Litigation Reform Act of 1995 (PSLRA) implemented several significant substantive changes affecting certain cases brought under the federal securities laws, including changes related to pleading, discovery, liability, class representation and awards fees and of 1995. Readers are cautioned that any such statements are not guarantees of future performance and that actual developments or results may vary materially from those in these "forward looking statements" The TSX Venture Exchange does not accept responsibility for the ad equacy or accuracy of this release Alexis Minerals Corporation (TSX VENTURE:AMC) |
|
||||||||||||||