Printer Friendly
The Free Library
19,585,452 articles and books
Member login
User name  
Password 
 
Join us Forgot password?

Alaska Airlines Breaks Ground On $33 Million Seattle Hangar Expansion.


Business Editors

SEATTLE--(BUSINESS WIRE)--June 14, 2001

Alaska Airlines (NYSE NYSE

See: New York Stock Exchange
:ALK ALK Alkohol (German: alcohol)
ALK Alkaline
ALK Anaplastic Lymphoma Kinase
ALK Automatisierte Liegenschaftskarte
ALK Activin Receptor-Like Kinase
ALK Alkylation
ALK Srilankan Airlines (ICAO code) 
) broke ground today on the $33 million remodel re·mod·el  
tr.v. re·mod·eled also re·mod·elled, re·mod·el·ing also re·mod·el·ling, re·mod·els also re·mod·els
To make over in structure or style; reconstruct.
 and expansion of the airline's maintenance hangar at Seattle-Tacoma International Airport Seattle-Tacoma International Airport (IATA: SEA, ICAO: KSEA, FAA LID: SEA), also known as Sea-Tac Airport, is located in SeaTac, Washington, United States at the intersections of Washington State Route 518, Washington State Route 99 and .

The project, which will be completed in two phases by fall 2002, will add more than 100,000 square feet of workspace at the existing office/hangar complex, which is located at the south end of the airport.

"This project represents a significant investment in the future of our maintenance and engineering division," said Bill Ayer, Alaska's president and chief operating officer Chief Operating Officer (COO)

The officer of a firm responsible for day-to-day management, usually the president or an executive vice-president.
. "In addition to improving the work environment, it will allow us to bring all maintenance and engineering functions in the Seattle area under one roof."

In addition to the construction of new workspace, approximately 70,000 square feet of existing hangar and office space will be remodeled.

Phase one of the project, which is scheduled for completion this fall, will add 18,500 square feet above the existing parts storage and avionics component shops that connect the old hangar (built in 1966) to the newer hangar (built in 1985).

The centerpiece of the second phase will be construction of a three-story wing on the hangar's southeast side totaling 83,500 square feet. The first and second floors of the addition will house parts storage, support shops, locker rooms, an expanded lunchroom and maintenance support offices. The third floor will house engineering, training, maintenance support offices and senior management.

The project master plan and initial design of phase one was provided by The Austin Company. Architectural design for the second phase was provided by ECH ECH Echelon
ECH Echangeur (French: Exchange; Canada Post street designation)
ECH Electron Cyclotron Heating
ECH Epichlorohydrin
ECH Echinacea
ECH Emergency Command Hologram (Star Trek) 
 Architecture of Seattle. M.A. Mortenson Company is the General contractor.
COPYRIGHT 2001 Business Wire
No portion of this article can be reproduced without the express written permission from the copyright holder.
Copyright 2001, Gale Group. All rights reserved. Gale Group is a Thomson Corporation Company.

 Reader Opinion

Title:

Comment:



 

Article Details
Printer friendly Cite/link Email Feedback
Publication:Business Wire
Date:Jun 14, 2001
Words:278
Previous Article:Fitch Rates Brazos Higher Education Authority Student Loan Revs.
Next Article:Fitch Rts Brazos Student Finance Corp Student Loan Asset-Bkd Nts.
Topics:



Related Articles
Diary of a Disaster.
UNMANNED `FLIGHT' PILOTLESS 767 JETLINER BREAKS FREE AT LAX.
Draft report: Too little grease.
Horizon Air to offer local cargo service.
IDA to give JetBlue Airlines $50 million for expansion.
JetBlue breaks ground at John F. Kennedy Airport.
Airport project takes off.
Airline News - North America.
Company Watch - Alaska Airlines.
Company Watch - Lufthansa.

Terms of use | Copyright © 2012 Farlex, Inc. | Feedback | For webmasters | Submit articles