Abu Dhabi - Habshan Expansion.Abu Dhabi Abu Dhabi (ä`b thä`bē, zä–, dä–), Arab. Abu Zabi, sheikhdom (1995 pop. 928,360), c. Gas Industries Co. (Gasco) has set a tentative deadline
of July 9 for the submission of commercial bids for the $250-300m EPC (1) (Entertainment PC) See HTPC.(2) (Electronic Product Code) A standard code for RFID tags administered by EPCglobal Inc. (www.epcglobalinc.org). contract covering the first phase of the proposed Habshan gas expansion project, following approval from the Supreme Petroleum Council (SPC 1. (business) SPC - Statistical Process Control. Something to do with quality management. 2. (body) SPC - Software Productivity Centre. 3. (company) SPC - Software Publishing Corporation. 4. ) to proceed with the bidding process. Only two of the six prequalified firms - Fluor Corp. and Bechtel of the US - submitted technical bids for the job in March. The contract includes supply and installation of two sulphur recovery units (SRUs) an acid gas enrichment unit, and a utilities package which includes installation of nitrogen cooling water units, air filters and related facilities. The contract will take 30 months to complete. The SRUs will process increased volumes of acid gas to be produced from the third phase of the onshore on·shore adj. 1. Moving or directed toward the shore: an onshore wind. 2. Located on the shore: an onshore beacon; an onshore patrol. adv. gas development (OGD-3) project. Fluor is the front-end engineering and design (FEED) contractor. Foster Wheeler of the US is the project management consultant (PMC (1) See Portable Media Center. (2) (PCI Mezzanine Card) A PCI-based mezzanine card that is widely adapted to VMEbus, CompactPCI and PCI cards. ). The Jacobs Engineering of the US has the contract to carry out process design and engineering services for the SRUs and the acid gas enrichment unit. (See survey in Vol. 64, Nos. 1-4). |
|
||||||||||||||||

thä`bē, zä–, dä–)
Printer friendly
Cite/link
Email
Feedback
Reader Opinion