Printer Friendly
The Free Library
19,573,962 articles and books
Member login
User name  
Password 
 
Join us Forgot password?

A Prefeasibility Report on Captive Power Plants in India - Understand the Immense Potential for Power Generation in the Country.


DUBLIN Dublin, city, Republic of Ireland
Dublin, Irish Baile Átha Cliath, county borough (1991 pop. 915,516), Leinster, capital of the Republic of Ireland, on Dublin Bay at the mouth of the Liffey River.
, Ireland -- Research and Markets (http://www.researchandmarkets.com/research/a17558/prefeasibility_re) has announced the addition of the "Pre-feasibility Report on Captive captive

said of naturally wild or feral animals kept in captivity for educational and scientific investigation with no attempt being made to domesticate them.
 Power Plants in India" report to their offering.

This Prefeasibility Report is a must read for those interested in setting up a project or having interest in the given sector. It provides the requisite inputs for setting up a specific project. These inputs range from broad market aspects to details like funding of the project, selection of location, plant and machinery plan etc. The report comes with a soft copy of a financial model. To check the viability of his/her project, the buyer can customise this model according to according to
prep.
1. As stated or indicated by; on the authority of: according to historians.

2. In keeping with: according to instructions.

3.
 the specific requirements.

This Pre-feasibility report on Captive Power Project (5 MW) is prepared taking into account the immense potential for power generation in India country. This report is structured into 5 chapters consisting of Project Concept, Industry Scenario, Captive Power Scenario in India, Project Details and Conclusion.

This report provides an overview of Indian Power sector, demand & supply of power, industry segmentation & structure and growth drivers. It also gives insight into the procedure for setting up a power project, type of machinery required, requirement of permissions & clearances, capital outlay capital outlay

See capital expenditure.
, profitability, payback period Payback Period

The length of time required to recover the cost of an investment.

Calculated as:
, internal rate of return (IRR IRR

In currencies, this is the abbreviation for the Iranian Rial.

Notes:
The currency market, also known as the Foreign Exchange market, is the largest financial market in the world, with a daily average volume of over US $1 trillion.
) and other project related analysis. The financial model of the project will also be provided along with the report. The potential buyer may customize the calculations in this user friendly model by imputing his numbers and see the viability of his project.

Bullish Bullish

Word used to describe an investor's attitude. Bullish refers to an optimistic outlook, while bearish means a pessimistic outlook.


bullish 
 economic growth story of any country depends on a robust power generation & delivery model. A weak power infrastructure impedes the growth potential & thus pulls back the growth initiative. India's per capita [Latin, By the heads or polls.] A term used in the Descent and Distribution of the estate of one who dies without a will. It means to share and share alike according to the number of individuals.  power consumption was 490 units (Kwh) in 2004-05 which was one third compared to 1500 units of China at that time. Indian consumption stood to about 644 units in 2007-08 at an annual average growth of 10.47%. However, during the same period, China's consumption has grown at an approximate growth rate of 12 to 13% per annum Per annum

Yearly.
 expanding the gap to some further extent.

This Pre-feasibility report on Captive Power Project (5 MW) is prepared taking into account the immense potential for power generation in the country.

Scope of Report

The report is structured into five chapters: Project Concept, Industry Scenario, Captive Power Scenario in India, Project Details and Conclusion.

- It presents the Indian industry scenario of power sector in terms of overview, segmentation, structure of generation entities

- It provides an insight on Indian captive power plant scenario with reference to segmentation, advantages, need for captive power plant etc

- It analyses and presents the project details highlighting the steps involved, technical aspects, Human resources The fancy word for "people." The human resources department within an organization, years ago known as the "personnel department," manages the administrative aspects of the employees. , mobilizing mobilizing,
v 1. freeing or making loose and able to move.
2. observing any ongoing movements in a client's body, whether small or large, assisted or not, that identify strengths and weaknesses, as well as the client's physical and
 bank loans, critical factors, issues & challenges, financial estimates etc

- The financial model of the project is also provided along with the report. The potential buyers may customise the calculations in this user-friendly model by imputing their numbers and see the viability of their projects.

Reasons to Buy

- Spot opportunity to set up a captive power plant under the given conditions

- Suggests a project plan with all required information

- Provides a thorough understanding about the various parameters to be considered to set up a captive power plant

- Sample financial analysis is given to examine the financial viability with their inputs for a project.

This report along with the financial model will be useful to existing industrialists planning to setup See BIOS setup and install program.  Captive Power plant, banks offering loan services to independent power producers, management & financial consultants, and administration and management students.

Key Topics Covered:

- Project Concept

- Industry Scenario

- Captive Power Scenario in India

- Project Details

- List Of Tables

- List Of Figures

For more information visit http://www.researchandmarkets.com/research/a17558/prefeasibility_re.
COPYRIGHT 2008 Business Wire
No portion of this article can be reproduced without the express written permission from the copyright holder.
Copyright 2008 Gale, Cengage Learning. All rights reserved.

 Reader Opinion

Title:

Comment:



 

Article Details
Printer friendly Cite/link Email Feedback
Publication:Business Wire
Article Type:Report
Date:Oct 3, 2008
Words:620
Previous Article:Detailed Information Resource for OTC Healthcare in Asia-Pacific with Forecasts to 2011.
Next Article:Comprehensive Report Examines the Light Trucks Industry in India.
Topics:



Related Articles
GAS-FIRED POWER GENERATION.
MHI Establishing Supercritical Pressure Boiler Manufacturing JV in India with Larsen & Toubro.
MHI to License Production Technology of Pumps for Thermal Power Plants to BHEL, India's Largest Heavy Electrical Machinery Manufacturer.
MHI to Establish Steam Turbine and Generator Manufacturing and Selling JV in India with Larsen & Toubro; Follow-up to Supercritical Boiler JV.

Terms of use | Copyright © 2012 Farlex, Inc. | Feedback | For webmasters | Submit articles