700 megawatt plant - CCPP Deir Ali 2.Project Location: South Damascus Details : The Ministry of Electricity and Public Establishment of Electricity for Generation and Transmission (PEEGT PEEGT Public Establishment of Electricity for Generation and Transmission ) has awarded ANSALDO Energia/METKA Consortium, with METKA as leader for the contract worth SYD41.2 billion ($896 million) to build CCPP CCPP contagious caprine pleuropneumonia. Deir Ali 2 - a natural gas-fired power plant in Syria. The project involves the engineering, procurement and construction (2) (Electronic Product Code) A standard code for RFID tags administered by EPCglobal Inc. (www.epcglobalinc.org). ) of a 700 megawatt plant and minimum electrical power efficiency of 55.3 per cent at the reference temperature and altitude of the power plant, and use of the reference natural gas of the contract, located 35 km south of Damascus. Metka has a 75 per cent stake in the venture with Italy's Ansaldo Energia Ansaldo Energia, a śubsidiary of Finmeccanica, is an Italian power company, with an experience of more than a hundred years. Ansaldo Energia covers the entire power generation spectrum with a combination of plant engineering, manufacturing and service activities. , a unit of Italy's Finmeccanica, holding 25 per cent. Contact Details: Metka Headquarters 11, Mar. Antypa str 14121 N Iraklio Athens, Hellas Greece Tel : +30 210 270 9200, 687 7395 Fax : +30 210 275 9528, 687 7400 Email: info@metka.gr; nikos.kontos@mytilineos.gr Saudi Economic Survey. All rights reserved. Provided by Syndigate.info an Albawaba.com company |
|
||||||||||||||||||||||

Printer friendly
Cite/link
Email
Feedback
Reader Opinion