Printer Friendly
The Free Library
19,573,962 articles and books
Member login
User name  
Password 
 
Join us Forgot password?

3D Systems Announces the Installation of SLS Systems at the Renault F1 Team Advanced Digital Manufacturing Centre.


To download high-resolution, print-ready JPEG JPEG
 in full Joint Photographic Experts Group

Standard computer file format for storing graphic images in a compressed form for general use. JPEG images are compressed using a mathematical algorithm.
 images, click on the thumbnail image above.

WARNING: these images are

very large (800K+)

Click here for caption

To download high-resolution, print-ready JPEG images, click on the thumbnail image above.

WARNING: these images are

very large (800K+)

Click here for caption

Business Editors/Automotive Writers/High-Tech Writers

MULTIMEDIA AVAILABLE:

http://www.businesswire.com/cgi-bin/mmg.cgi?eid=4613865

VALENCIA, Calif.--(BUSINESS WIRE)--April 13, 2004

3D Systems Corporation (Nasdaq:TDSC TDSC Thai Development Support Committee
TDSC Time Domain Signal Coding
TDSC Test Driver System - Charlie
TDSC Time-Domain Spreading Code
) announced the installation of two Vanguard(TM) HS SLS (Selective Laser Sintering) See laser sintering and 3D printing. (R) systems at the Renault F1 Team Advanced Digital Manufacturing (ADM See add/drop multiplexer.

(language) ADM - A picture query language, extension of Sequel2.

["An Image-Oriented Database System", Y. Takao et al, in Database Techniques for Pictorial Applications, A. Blaser ed, pp. 527-538].
(SM)) Centre in Enstone, England. The addition of the SLS (selective laser sintering See laser sintering and 3D printer. ) systems enables the team to directly manufacture end-use parts for the R24 racecar race·car  
n. Sports
An automobile used for racing.
.

Renault F1 Team produces parts on the SLS system for the cooling system cooling system: see air conditioning; internal-combustion engine; refrigeration.
cooling system

Apparatus used to keep the temperature of a structure or device from exceeding limits imposed by needs of safety and efficiency.
, the electrical system and various body parts of the Renault F1 R24. The Team plans to commence manufacturing a large quantity of parts for the racecar on the new SLS systems in-house, increasing production speeds by at least 30%, and realizing significant time and cost savings.

The Renault ADM Centre supports all Formula 1 design, wind tunnel wind tunnel, apparatus for studying the interaction between a solid body and an airstream. A wind tunnel simulates the conditions of an aircraft in flight by causing a high-speed stream of air to flow past a model of the aircraft (or part of an aircraft) being tested. , full-scale applications and low-run production parts for the Renault F1 Team racecar. In addition to the two newly commissioned Vanguard HS SLS systems, the ADM Centre employs four SLA (1) (StereoLithography Apparatus) See 3D printing.

(2) (Service Level Agreement) A contract between the provider and the user that specifies the level of service expected during its term.
(R) 7000 systems, an OptoForm(TM) direct composite manufacturing (DCM DCM
abbr.
Distinguished Conduct Medal
) system and a ThermoJet(R) printer.

"The addition of the SLS system capacity to the ADM Centre forms part of our long-term vision for rapid direct manufacturing," said John Mardle, Renault F1 Team Operations Director. "Rapid direct manufacturing plays a significant role in the future production of our racing cars, as we strive to reduce lead times further and guarantee the best possible level of production response time. Through our collaboration with 3D Systems, we benefited from significant advancements in material developments in the field of stereolithography The first 3D printing technology, which was pioneered by Chuck Hull of 3D Systems. See 3D printing. . Using our new SLS system capabilities, we plan to push the technology and applications envelope further."

"Understanding the importance of speed to the racing world, 3D Systems and the Renault F1 Team partnered to create unique rapid design and manufacturing capabilities enabling the Team to dramatically reduce their design cost and time," said Abe Reichental, 3D Systems' Chief Executive Officer. "Working in a fiercely competitive environment, the Renault F1 Team continually pushes the use of solid imaging technology through rigid material testing, to direct manufacturing of production parts for wind tunnel testing to the manufacturing of parts used directly on the racecar. By working closely with leading-edge partners like the Renault F1 Team, understanding their needs, wants and operating environment, we are able to deliver to our partners an expert solution that enables their success, improves their overall performance and enhances their competitive posture. The opportunity to work closely with innovative partners like Renault F1 Team provides us a glimpse towards a future alternative manufacturing environment for the entire automotive industry and beyond."

About 3D Systems

Founded in 1986, 3D Systems(R) provides customer-driven solid imaging products and systems solutions that reduce the time and cost of designing products and facilitate direct and indirect manufacturing. Its systems utilize patented proprietary technologies to create physical objects from digital input that can be used in design communication, prototyping and as functional end-use parts.

More information on the company is available at www.3dsystems.com, or by phoning 888-337-9786, ext. 2882 (or 661-295-5600, ext. 2882, from outside the United States), or via email at moreinfo@3dsystems.com.

MULTIMEDIA AVAILABLE: http://www.businesswire.com/cgi-bin/mmg.cgi?eid=4613865
COPYRIGHT 2004 Business Wire
No portion of this article can be reproduced without the express written permission from the copyright holder.
Copyright 2004, Gale Group. All rights reserved. Gale Group is a Thomson Corporation Company.

 Reader Opinion

Title:

Comment:



 

Article Details
Printer friendly Cite/link Email Feedback
Publication:Business Wire
Geographic Code:1USA
Date:Apr 13, 2004
Words:592
Previous Article:Younan Properties, Inc Acquires Largest Office Building in Downtown Phoenix; The 400,000 SF Building Will Undergo a $5 Million Renovation Effort.
Next Article:Dow Jones & Company 2004 Advertising Linage Percentage Increases - Decreases - from 2003.
Topics:



Related Articles
3D Systems Completes DTM Acquisition.
Renault Formula 1 Team and 3D Systems Establish First Formula 1 Advanced Digital Manufacturing Center.
Multimedia Available: Renault Formula 1 Team and 3D Systems Establish First Formula 1 Advanced Digital Manufacturing Center.
FORMING A NEW PARTNERSHIP RENAULT'S F1 TEAM SIGNS WITH VALENCIA DESIGN FIRM.
3D WILL DESIGN PARTS.
Renault F1 Team and 3D Systems Launch Advanced Digital Manufacturing Center.
Newstream.com Digest: Advanced Digital Manufacturing Center for Renault F1 Team, Third `Harry Potter' Film Begins Production, The Perfect Pancake.
Multimedia Available: 3D Systems Announces the Installation of SLS Systems at the Renault F1 Team Advanced Digital Manufacturing Centre.
3D Systems Announces First Installation of Sinterstation Pro SLS System in Europe at the Renault F1 Team ADM Centre.

Terms of use | Copyright © 2012 Farlex, Inc. | Feedback | For webmasters | Submit articles